Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for Craig C. for Construction Worker / Construction & Home Improvement in Liverpool, United Kingdom. Search More Resumes for Construction Worker on Resumark.com #4ENYS6UAN
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for Craig C. for Construction Worker / Construction & Home Improvement in Liverpool, United Kingdom




Occupation: Construction Worker Industry: Construction & Home Improvement
Country: United Kingdom City: Liverpool
State: Merseyside ZIP: L10 3JF



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
PDF]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
Mr Craig C.
Altway,
Aintree Village,
Liverpool,
Merseyside
L JF
United Kingdom
Email:
Phone: +
th September
Dear Sir/Madam,
Please accept this cover letter as a supplement to my Resume, which I hope will give you an
understanding of my character, integrity and sincerity of my application for employment in
your organisation.
I am years of age and live in Aintree Village; you may know it as the home of the
famous Grand National Steeplechase Race. During my career as a Shotcreter I have
travelled all over the United Kingdom on many contracts and I am currently working on a
drill & blast contract near Loch Ness in Scotland.
I have worked for BAM Ritchies for over ten years and during this time I have been
promoted to my current position and attended many training courses to further my
career.
I have been married to my wife Michelle for just over twelve months and we are hoping to start a
family as soon as possible and feel it is the correct time to realise my objectives and make a better
future to support my family.
I am honest, trustworthy and very loyal. These attributions have been embedded in me
during my childhood from my parents for which whom have total respect.
Please find attached my Resume and I would welcome the opportunity to expand on my
skills, career and personal details at any time convenient.
Yours Sincerely,
Craig C.
|RESUME | |
|Nozzleman; Sprayed Concrete | |
|Personal Details: |Name: |
|Address: Altway, Aintree, Liverpool, L JF, UK |Craig Michael |
|Mobile: + |C. |
|Email: | |
|Key Skills: |Date of Birth: |
|Experienced nozzleman, both wet and dry spray, applied by hand | March |
|and robotic means | |
|The machinery I have worked with includes REED, ALIVA, PICCOLA | |
|dry spray, and MEYCO SUPREMA, ARUGA, POCA and POTENZA wet | |
|spray. | |
| | |
|I understand admixtures in shotcrete, their benefits and how and | |
|when they should be used. I am very confident in my ability to | |
|apply shotcrete/sprayed concrete. I am able to work to drawings | |
|and understand ground conditions, specifications, needs and | |
|requirements. I am an excellent team worker, and able to think on| |
|the spot and overcome obstacles. | |
| | |
|Pump/machine and plant operator: I have recently passed EFNARC | |
|theory assessment, and awaiting the practical assessment, of | |
|which I am extremely confident in achieving. | |
| | |
|I have been in the sprayed concrete industry for nearly years,| |
|working my way through the ranks to nozzleman. I have worked on | |
|many different types of projects, including piled walls, jetty | |
|repair, rock/slope stabilisation, bridge/culvert and arch | |
|repairs/strengthening, but mainly in tunnel lining; including | |
|road, rail and hydro. | |
| | |
|The most recent, notable projects I have been involved in are | |
|relining Dover Harbour and Abbotscliffe tunnels in , and | |
|presently the Glendoe Recovery Project. | |
| | |
|CSCS Sprayed Concrete | |
|CPCS Telehandler | |
|CPCS Rear Tipping Dumper all sizes | |
|Confined Space Trained | |
|HGV Class / Concrete Mixer | |
|EFNARC Theory Assessed Robotic Application of Shotcrete | |
|Pressure Grouting | |
|Assisting Drilling Operations | |
|Assisting Blasting Operations | |
|MuckingOut | |
|Installation of rock bolts | |
|Attended various site specific safety induction courses | |
|throughout the UK and Europe | |
| |Qualifications: |
| | |
| |GCSE’s |
| | |
| |Maths C |
| |English C |
| |History C |
| |Date of joining |
| |last company: |
| | |
| |Time in this |
| |position: |
| | years |
|Career Summary: |Photograph: |
| |[pic] |
|Present: BAM Ritchies Division of BAM Nuttall Ltd. | |
| | |
|BAM Ritchies Sprayed Concrete | |
| | |
| : Northwest Joinery | |
| | |
|Trainee bricklayer | |
| | |
| – : Merseyside Precision Engineering | |
| | |
|Apprentice engineer | |
|Detailed Project Experience: |
| |
|Sprayed Concrete works including the following ; |
| |
|Glendoe Recovery project still active |
|Dover and Abbotscliffe tunnels |
|Port of Workington, North Jetty Phase & , Tidal repair works |
|Port of Workington Berth , Tidal repair works |
|Helensburgh Sea Wall, Tidal repair works |
|Morcambe Sea Wall, Tidal repair works |
|Gibraltar slope stabilisation |
|Gibraltar Dudley Ward Tunnel |
|St Thomas rail arches strengthening, Exeter |
|Longannet Power Station water outlet lining |
|Rodney Street tunnel strengthening, Edinburgh |
|Rail Underbridges at Breich, Cumbernauld |
|Rail Underbridge, Kelvinside, Glasgow |
|Forth St Rail Arches, Newcastle |
|Combe Down Stone Mines, Bath |
|A.W.N. Pit, Intel Works, Southern Ireland, |
|Underground Hospital, Jersey. |
|Winchburgh Retaining Wall Railtrack |
|Lochay Hydro Electric Tunnel Project |
|Slocht Summit Rail Tunnel

Cancel
Not Enough Credits
Sorry, but you don't have enough credits to download this resume.

Purchase more credits
Not Available
Sorry but this resume is not available for download. Please choose another!

Close
Confirm Download

Would you like to download  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again
Confirm View Complete Resume

Would you like to view  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again