Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for osama E. for Engineer / Construction & Home Improvement in Cairo, Egypt. Search More Resumes for Engineer on Resumark.com #1NOFO4TAD
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for osama E. for Engineer / Construction & Home Improvement in Cairo, Egypt




Occupation: Engineer Industry: Construction & Home Improvement
Country: Egypt City: Cairo
State: Al Qahirah ZIP: 11737



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
RTF]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
Curriculum Vitae 
 

 
 

Career Objective: 

                                                                                                           

** To obtain a challenging position in the area of project construction, , steel welding, and steel erection: boilers, tanks, piping & steel structure.  

  • Name  : Eng'r. Osama Mahmoud Abd Elhamed E.
  • Date of birth         :th June
  • Nationality  : Egyptian
  •  
     
  • Contact Tel. in Egypt :   / 
  •  
  • Communication postal address:   Heliopolis, Cairo, Ismael Ramzy Street,                        
  • Apartment No , Cairo, Egypt
  • Email address:      
  • Education:
  •  
  • B.Sc. Degree in Mechanical Engineering Power Section in from Faculty of Engineering, Ain Shams University.
  • Level II NDT UT   Ultrasonic inspection. ASNT
  • Level II NDT P.T   Liquid penetrant inspection ASNT
  • Level II NDT M.T   Magnetic particle inspection ASNT
  • Level II NDT V.I     Visual Inspection ASNT
  •  

    *  AutoCAD D training course:  from Cairo University. 

  • Primavera P course
  •    

    *  Diploma in the specialty of “Heat Treatment” in the Academic year / from Tabbing Institute for Metallurgical Studies TLMS. 

    *  Training course on “Welding technology, welding metallurgy and nondestructive testing” from “Central Metallurgical Research and Development Institute CMRDI”. 

    *  Training course held on “Entrance for Weldment Design” From The Egyptian Engineering Committee. 

    * Training course held on “Welding Technology For Engineers from Industrial Design Development Center. 
     
     
     

    WORK EXPERIENCE : 

    FROM .Feb. until  .. 

      Technical office manager In Carlo Gavazzi Egypt under UDHE as a main contractor in Piping Project under Supervision of UHDE Co. as a main contractor. The Project is Ammonia / Urea fertilizers in Damietta in Egypt. Our scope is to construct the piping from compressor to turbine

       My responsibility is:

  • Arranging  project scheduling and follow up piping activities by Primavera
  • To issue weld maps for all pipelines isometrics.
  • Evaluate the daily and weekly site progress, and report to the site manager
  • Prepare the as built drawing.
  • Coordinate the work with the UHDE site engineer.
  • Prepare Layout, and detail drawings for pipe supports. by AutoCAD
  •  
     

    FROM APRIL UNTILL // 

    Working with “LEAD CO.” Under Saipem as main contractor as Senior Technical Office engineer   in the UTBS

    “Southern unit for treating the crude oil in “HASSI MASSOUD" ALGEREA.

  • Review documents/drawings submitted by the client
  • Classify all documents as a hard copies and soft copy
  • Preparing the layout for the project
  • Preparing the fabrication sequence for the project.
  • Supervising for the work shop drawings done by the draftsman
  • Review documents/drawings submitted by the client
  • Preparing the layout for the project
  • Preparing the fabrication sequence for the project.
  •  
     

    DURING JUNE UNTILL March  

    Working with WINTERSHALL PETROLIUM COMPANYhired from Bonatti as “Technical office engineer ”Jahkira” in Libya” Gas Oil Separation Plant GOSP and Gas Utility Plant GUP,

  • Review documents/drawings submitted by the client
  • Preparing the layout for the project
  • Preparing the fabrication sequence for the project.
  • Supervising for the work shop drawings done by the draftsman
  • Distribute approved fabrication,W.S.D. to Yard ,material control QA/QC
  • Preparing the reports and weekly submitted to the client
  • Attend to any site problems associated with project and suggest solutions/alternatives
  •        for the client' approval

  • Issue site Queries, follow up, and close out
  • I am authorized person for the AsBuilt signing of all drawings after compilation of the project.
  •  
     
     

    During April Untill  May

    Worked with SAFARI Co. Ltd. as “Senior Site Engineer” in Restoration Piping project in King Abdul Aziz Naval Base in Jubail, Saudi Arabia.

  • Prepare drafts and shop drawing for piping plane and pipe supports
  • Prepared the welding procedure W.P.S for Carbon Steel Pipes for the application of diesel line.
  • Prepared the performance qualification record P.Q.R.
  • Training and qualify four welders for G position and welder for G position
  • Supervised the Welding and Radiographic testing for diesel line pipes
  • Supervised the fabrication for common support pipelines.
  • Supervised the fabrication for Hydraulic pipe line supports
  •  
     
     

    During March to March    

    Worked as WorkShop Manufacturing Section Head”, with “INTERNATIONAL Co. for BOILERS & PRESSURE VESSELS IBSF”

    Responsibilities were:

    Preparation of route sheets, material estimation, and shop drawings for tanks, pressure vessels, and piping and steel structure.

    NOTE: Route sheet is a document indicates the steps of fabrication, and the inspection needed and the hold points, type of material used..Etc.  

    During Nov.   to  Sept.  

    Worked as Technical Office Engineer” with KOLALY ENGINEERING Co. in Egypt. 

    Responsibilities were:

  • To prepare the workshop drawing for Steel Structure Buildings; Towers, Bridges or pipe racks
  • To prepare the cut sheets for tanks or vessels
  • To estimate the material list upon which Purchasing order is released.
  • To prepare Bolt list & Bolt plan, Bolt list should be sent to purchasing department.
  • Bolt plan is sent to erection department

  • To prepare Assembly list. Assembly list include: item main size, length, quantity & weight, Assembly list is sent to erection department
  •       ُ

    Examples for projects, which I participated in: 

    Niigata project: it was ton steel structure pipe bridges TOYO project: it was a factory for petrochemicals in Sues, in which I prepare the checkered plate platform, workshop drawing for stairs and ladders.

    Ques” Newsprint paper factory project: I prepared the Workshop drawing for the main store building ton I make a complete revision for wet cleaning Building ton steel structure. I make a complete design for the grating of the recovery Boiler, which was ton steel structure & meter height. The grating weight was about ton.  

    Also I prepared bolt list, bolt plan, assembly list & material list for many buildings in that factory.  

    Workshop drawing of the steel structure of Mazout tank. Handrail & stairs workshop drawing for the Mechanical Bulb Building, Chemical bulb building & Recovery boiler building. 

    During        

    Worked with “MITSUBISHI HEAVY INDUSTRIES Co.” as a Technical Supervisor, for tank erection for * Mega watts Thermal Electric Power station in Aleppo, Syria.

    My duties were:

  • To check the material Bechtel Supplied incoming of the tanks in the light of the packing list and drawing & to report to my chief about any missed items or incorrect material such as: check the shell course sheets; its thickness; its quantities; its dimension.
  • Check the bottom plates & annular plates.
  • Check the nozzles, flanges, manholes, bolts, roof steel structure, and all other items
  • To supervise erection work such as:
  •   Assembly of annular plates

      Assembly of bottom plates

      Assembly of shell plate

      Welding sequences

      Visual inspection for welding

      Assembly of roof structure & Roof plate 

  • Witnessed in all inspection tests such as:
  •  Air vacuum test for bottom plate welding

     Oil leak test for shell plates welding

     Roundness test inside the tank

     Banding test inside the tank with a vertical sweep board.

  • Plumpness test inside the tank
  • Liquid penetrate test for annular plates welding
  • Preparation for water filling test for the tanks.
  •  

     Nasr Boiler Co. & Babcock & Wilcox Co. 

  • The field of work is manufacturing and erection of:
  •  Pressure Vessels

     Fire tube boilers

     Water tube boiler

     Heat exchangers

     Oil tanks 

  • As a

  • Cancel
    Not Enough Credits
    Sorry, but you don't have enough credits to download this resume.

    Purchase more credits
    Not Available
    Sorry but this resume is not available for download. Please choose another!

    Close
    Confirm Download

    Would you like to download  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again
    Confirm View Complete Resume

    Would you like to view  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again