Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for Jaco-Niel B. for Construction Worker / Energy & Utilities in Mossel Bay, South Africa. Search More Resumes for Construction Worker on Resumark.com #3JDPDBFTN
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for Jaco-Niel B. for Construction Worker / Energy & Utilities in Mossel Bay, South Africa




Occupation: Construction Worker Industry: Energy & Utilities
Country: South Africa City: Mossel Bay
State: Western Cape ZIP: 6500



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
MS WORD]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
 
 
 
 
 
 

PERSONAL DETAILS: 

Name: B., JacoNiël

ID Number:   

Passport Number: South African Expires: //

Marital Status: Engaged

Previous Position: Field Engineer Commissioning

Email:

Address:

Montagu street

Mossel Bay 

South Africa

Telephone Cell: + or +

Drivers’ license: EB

Criminal Record: None

Availability: Immediate

Position required: Construction/Piping Superintendent/Supervisor, Field Engineer PMT preference Engineering / Construction Interface / Planner / Project Manager

Salary Requirements: Negotiable  

EDUCATION – SECONDARY SCHOOLING:

Year Matriculated:

Last School Attended: Worcester High School, South Africa

Subjects:

English

Afrikaans

Maths

Science

Biology

Geography 

EDUCATION – TERTIARY:

Civil Engineering Diploma 

Project Management

Primavera

Additional Training: Various CBI Inhouse Safety and Production Training

Auto CAD

A++ Microsoft Engineering

Confident in various computer applications 
 
 
 
 
 
 
 

CAREER HISTORY: 

Period: February – December

Position: Field Engineer Commissioning

Company: Saudi Arabian Kentz Co. Ltd.

Responsibilities: Field engineering role to oversee the precommissioning of Kentz, Jubail Port Project. Overseeing the hydro testing km pipelines from Port to Sipchem site in Jubail. Overseeing and completion of chemical cleaning on various lines to remove magnetite formed in CS lines. This included scraping of lines by means of scraper and lay –up of lines. In addition to chemical cleaning of lines, I was responsible to oversee the pickling and passivation of the stainless steel export lines to Sipchem plant and tank farm area, reinstatement and layup thereof. 

Period: September – October

Position: Piping Supervisor

Company: Lurgi GmbH Labuan; Malaysia; Mega Methanol Project

Responsibilities: Supervisory role to oversee the main piping contract for the client Lurgi GmbH. Ensuring that prioritization of work fronts are being adhered to in terms of safety, schedule and quality. Position includes liaising with other contractors and owner of the MT Mega Methonal Project in Labuan, Malaysia. From January , I was responsible to coordinate and ensure completion of the hydro testing activities and precommissioning that surrounds the position. This included the Pneumatic testing of the Oxygen plant. 

Period: June – September

Position: Senior Field Engineer / Sub Contract Manager

Company: Goss & Balfe Mechanical Contractors Uranium Project

Responsibilities: Goss & Balfe has been responsible for all the mechanical, piping and structural installation for the new process Uranium plant in Klerksdorp, South Africa.

Responsibilities: Overseeing all Subcontractors, office personnel and internal administration on site for the contract Goss & Balfe had. Responsible for all technical liaising with client, buying of onsite purchases and claim submittals for additional work performed as well as month end claims during this period. Handling all TQ and relevant data that the field required for installation of various disciplines 

Period: October – April

Position: Piping Supervisor

Company: Pioneer Mechanical Contractors Clean Fuel Projects – Cape Town

Responsibilities: Overseeing general work for the piping scope at Chevron Refinery for the Clean Fuel Conversions Project. Liaising with Foster Wheeler Engineering all progress and Technical correspondence. Submittal of claims for all additional word done. 

Period: September – October

Position: Piping Field Engineer

Company: CBI Sakhalin Island; Russia – LNG. Project

Responsibilities: Writing of and implementing procedures and method statements. Estimating and Scheduling of material flow and subcontract allocations. Setup and ordering of Tool lists for various applications of Piping Work. Oversee the Commissioning of two m² concrete Batch Plants. 
 
 

Period: December – June

Position: Senior Field Engineer 

Company: CBI  QATIF SITE; SAUDI ARABIA – GOSP PROJECT

Responsibilities: Overseeing the precommissioning of the Qatif Gosp site on piping activities. Supervisor for the Hydro Testing of all pipe work up to PSI with about People to report to me. The Handling of all Test Packs and Scheduling of Testing Works. Collation with customer representative and safe execution of the Pneumatic and Hydro testing. 

Period: March – December

Position: Field Engineer

Company: CBI Saudi Arabia Qatif – GOSP Project

Responsibilities:  Responsible for the setup of a fabrication shop. Engineering work which included the fabrication of various piping spools and supports for the Qatif GOSP Project. The Scope of work was to handle all documentation and Engineering responsibilities for the fabrication of spools, PWHT, NDE, painting and shipping of fabrication spools and supports to site. Last Three months served as acting Superintendent for the shop with about people that reported to me. 

Period: July – November

Position: Self employed

Company: B. Construction

Responsibilities: Owned small building company.

Any small construction work i.e.: painting, tiling, paving, plumbing, general building and fitting work. 

Period: January – June

Position: Field Engineer

Company: CBI Caltex Refinery – Sulphur Reduction Plant

Responsibilities: Responsible for the erection and documentation of the Sulphur Reduction plant and additional piping installation of shut down scope requirements. This scope included engineering works associated with material expediting to the work place and the inspection of the building of the tail gas unit, piping steel erection and fin fans. 

Period: February – August

Position: Salesman

Company: Aim Home improvements

Responsibilities: The sales of various services that the company provided. The company generally sold and installed burglar alarms, paving, tiling and vibrocrete walls, awnings and roofing. 

Period: September – December

Position: Field Engineer

Company: CBI Caltex Refinery – Saldanha Steel Project

Responsibilities: Overseeing of the erection of Pump houses with about pumps and heat exchangers each.

Overseeing the erection, material controlling, installation and documentation fo all spools and pipe racks to be installed in and around the pump houses. The last months served as a coordinator for all Piping Test Packs for the whole of CBI work scope. 
 
 

Period: January – December

Position: Foreman

Company: Netcon cc Civil Contractor

Responsibilities: Overseeing of the building of site work for a private development in Hout Bay. Work included the installation of all cable duct, sewer systems, retention walls and the laying of concrete roads on earthmoving for site preparation. Expediting and control of building material from suppliers and liaising with the client to have all the various civil and building work performed on schedule.


Cancel
Not Enough Credits
Sorry, but you don't have enough credits to download this resume.

Purchase more credits
Not Available
Sorry but this resume is not available for download. Please choose another!

Close
Confirm Download

Would you like to download  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again
Confirm View Complete Resume

Would you like to view  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again