Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for Kotamraju S. for Engineer / Energy & Utilities in Seoul, Korea, (South) Republic of. Search More Resumes for Engineer on Resumark.com #A7VJAI8TG
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for Kotamraju S. for Engineer / Energy & Utilities in Seoul, Korea, (South) Republic of




Occupation: Engineer Industry: Energy & Utilities
Country: Korea, (South) Republic of City: Seoul
State: Seoul-t'ukpyolsi ZIP: 135-856



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
MS WORD]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)

RESUME 
 

Kotamraju   Shiva Prasad , PMP       D.O.B  :       

           Flat No , Lartz Office Tel                         Email : 

           , BurimDong                                     Phone:  +

           DonganGu, Anayang                                  Passport No: G 

           Seoul South Korea                                                                                                                  

                                                            

***                                           

Maritial status  

 Married  and having one daughter. 

Educational Qualifications :                                                               

      B.E Electrical & Electronics Andhra University –    July ‘ First class.

PGDEM Energy Management Sri Krishnadevaraya University –Aug’ – First Class.                             

      MBA Marketing IGNOU New Delhi – DEC ‘.

      Certified Project Management Professional PMP, July

              Member of Project Management Institute PMI

      Member of Indian Institute of Engineers, India. M.I.E

Computer literate and can work with easy on all MS  office packages & internet.  

Brief Summary :

  Plus Years experience in  Design, Engineering, Construction,  Installation,   Commissioning,  Testing  and Maintenance  of  field  Instrumentation  and  Control  system in Thermal Power & Oil and Gas Plants . Worked with various contractors &  consultants like BHEL,DEC China, Desein ,TCE, DCPL, Lahmeyer International  India , L&T Sargent and Lundy in executing various power projects.
  • Experience in detailed instrumentation design.
  • Understanding of basic project management fundamentals, project economics, support and execution.
  • Exceptional analytical, problem solving, communication and interpersonal skills.
  • Having ability to work in a team environment as well as independently
  • A good working knowledge of networks, administration, computer systems & strong Microsoft Office computer skills.
  • Having fair knowledge on Smart Plant Instrumentation In tools.
  • Having working knowledge on DCS & PLC Systems.
  •  

        Experience in detail :

    I.   Samsung Engineering Co. Ltd.  SECL  December to till date

          I am presently working as Sr. Manager, Lead Engineer Instrumentation, engineering  and designing of ongoing projects and technical support to the Proposal Team for  refinery projects.

    A. Ongoing Projects:

  • Conceptual Study and preparation of Instrument design basis for     Cienfuegos Refinery Plant.
  • Open Book Estimate OBE for SAMCO KTA Acrylic Acid Plant.
  • GAS Jubail PhaseVIII PROJECT Air Separation Unit. MTPD            gaseous Oxygen and MTPD Gas Nitrogen.
  • B. Proposal Projects:

  • million MTPA Refinery at Skikda Modernization and Revamping  works. The EPC was successfully awarded.
  • , BPSD Refinery at Arzew Modernization and Revamping works.
  • . MTPA Diesel Hydro Treating plant DHDT  at MRPL.
  • KTA of Ethylene Plant  and  Utilities & Offsites  at UZKOR Gas Chemical LLC.
  • IBN Rushd PTA Debottlenecking Purified Terephthalic Acid KTA > KTA Plant.
  • The main activities of the team include the following activities:

  • Preparation of Instrument Index & I/O List based on the P & ID.
  • Review of Instrumentation vendor quotations for DCS/PLC/F&G Systems, Analyzer system and Control Valves.
  • Review of Instrumentation & Control Part in Mechanical Vendor Packages.
  • Technical support for Instrumentation works & cost to the Project Proposal Team.
  • Study Contract Specifications. 
  • Prepare and check Material Requisitions, Technical Specifications, Instrument Datasheets, Technical Bid Tabulations, and Purchase Order Specifications for DCS/PLC/F&G Systems, Analytical Measurement   System and Control Valves.
  • Review Vendor drawings to ensure proper interface and provide technical recommendations, if required.
  • Coordinate and communicate with Instrument Vendors at all project stages.
  • Use codes, standards and practices applicable to the design and installation of instruments API, ISA, ANSI, ASME, ISO, IEC and NEC codes.
  • Review Installation Drawings, Pressure Piping Hookup, Steam Tracing Hookup and Instrument Air Piping Hookup.
  • Interdepartmental Mechanical/Civil/Piping/Electrical checks and coordination. 
  • II. Previous Experience  

    A Lanco Infratech Ltd LITL EPC  July to December  

    Worked as Sr.Manager, Instrumentation and Controls. The job involved the following project management activities for  x MW LAPPL Thermal Power Plant  near Korba:

  • Framing of Conceptual designs as per the contract requirements.
  • Coordination with the EPC engineering consultant for the preparation of Tender specification, bid management, bid evaluation and analysis.
  • Instrumental in identifying and selection of appropriate vendors and contractors. 
  • Preaward Technical Discussions.
  • Detailed Design and Engineering as per specifications, Coordination & Interaction with main plant equipment manufacturers and Erection and Commissioning agencies
  • Review and approval of contract drawings, P& IDs , GA drawings, Quality assurance plan and inspection of equipments.
  • Erection and Commissioning supervision.
  • Conducted FAT for Emerson Ovation system DCS and GEFANUC PLC  for    BOP packages
  •  

           B Andhra Pradesh Power Generation Company APGENCO Jan’ to July  

    Worked as AE & ADE in C&I division Jan’ to June in Construction, Operations & Maintenance of x MW KTPS Plant .Was transferred June ‘ to July ‘ to the Thermal Project Constructions, engineering division, specializing in Control and Instrumentation systems for the following projects.   

  • Vijayawada Thermal Power Project Stage IV – x MW Unit .
  • Bhoopalapalli Thermal Project – x MW Unit
  • Rayalaseema Stage I & II x MW Units Unit  & .
  •  

          EPC Job Profile:

  • Post contract award Design & Engineering Coordination activities.
  • Interacted through organizing various kickoff and project coordination meetings with consultants, suppliers and E&C agencies for resolution of various interface issues and expediting project commissioning schedules.
  • Tracked and expedited various dispatches from project suppliers as per   Bar schedules.
  • Review and approval of contract drawings, P& IDs , GA drawings, Quality assurance plan and inspection of equipments.
  • Erection and Commissioning supervision.
  • Conducted FAT for Max DNA system DCS .
  •        O&M & Construction Job Profile:

  • Planning and handling unit outage jobs, and Spares   Management preparing specifications, indenting, quotation analysis and inspection.
  • Maintenance DCS Procontrol Distributed Sequential Control System for x MW  KTPS power station.
  • Making suggestions for improvements / modifications to minimize the defects   and carrying out preventive maintenance jobs.
  • Calibration of Field Instrumentation.
  • Trouble shooting of VFD drives for ID Fans & Boiler Feed Pumps.
  • Critical control loops Triple Redundant and important control  loops Dual Redundant for STGs. 
  • Preparation of Cable schedules, cable laying, testing and  loop checking etc.
  • Construction, Installation, Commissioning and Testing of Field Instruments,   Water & Gas Analyzers, CEMS , BMS ,TSI ,Control valves,  FSSS, ATRS & DCS  systems. 
  • Precommissioning checks: Open loop / closed loop checks, & Protection, Interlocks and Alarm checks.
  •  

    C. Field Engineer National Productivity Council NPC Hyd Jan’ to Dec’

                

    Worked as Field Engineer in Energy Management Division, National Productivity Council, Hyderabad .

  • Carried out Demand Side Management project in UPSEB and APSEB.
  • Conducted detailed energy audit for local industries like Praga Tools Ltd , Lotus Chocolates Pvt Ltd., etc.
  •  

    Other Details: 

        Current Location                                               Seoul , South Korea

        CTC                                                                        Negotiable

        Minimum Joining period required                Months

                                                                                                                  

    References

          .     Mr T. Subba Rao                                                 . Mr. S. Ramesh

          


    Cancel
    Not Enough Credits
    Sorry, but you don't have enough credits to download this resume.

    Purchase more credits
    Not Available
    Sorry but this resume is not available for download. Please choose another!

    Close
    Confirm Download

    Would you like to download  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again
    Confirm View Complete Resume

    Would you like to view  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again