Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for Predrag V. for Engineer / Energy & Utilities in Pancevo, Serbia. Search More Resumes for Engineer on Resumark.com #K8BXVDZSN
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for Predrag V. for Engineer / Energy & Utilities in Pancevo, Serbia




Occupation: Engineer Industry: Energy & Utilities
Country: Serbia City: Pancevo
State: Vojvodina ZIP: 26101



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
PDF]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
|CURRICULUM VITAE | | |
|PIPING ENGINEER | |
| | | |
|NAME |PREDRAG V. |
|DATE OF BIRTH |December th, |
|NATIONALITY |Serbian |
|QUALIFICATIONS |B.Sc. & M.Sc. Degrees. Faculty of Mechanical Engineering – University|
| |of Belgrade, Yugoslavia. Graduated in . |
|LANGUAGES |English fluent, Russian basic, Serbian native |
|COMPUTER SKILLS |Familiar with: AutoCAD, D modelling software: CAD Works Pipe Plant,|
| |P&IDs, making MTOs and isometrics and PDMS Design, Spooling and |
| |Draft Modules, MS Project, MS Office package – Word, Excel, Visio, |
| |Power Point; |
|TRAINING |MS Excel I and II |
|EMAIL ADDRESS: | |
|PHONE NUMBER: | |
| |Serbia: + |
|WORKING EXPERIENCE | years |
|PROFESSIONAL |Passed professional state exam for gas and gained license for |
|AFFILIATIONS |design and maintenance of gas installations, in . |
| |Passed professional main state exam and gained license for design |
| |and construction supervision of gas and oil installations, in . |
|SUMMARY OF SKILLS: |
|Proven experience in all levels of design and construction engineering working with reputable |
|companies in Europe, Asia and Africa, on Oil & Gas projects including: |
|Engineering of oil and gas surface production facilities and pipelines and process plants. |
|Feb. . – Feb. |TAKNIA Libya Engineering Company |Tripoli, Libya |
| |TEKNICA UK Ltd. | |
|Project Lead Piping and Pipeline Design Supervisor |
|Involved in designing of the following projects: |
|ElLATEEF Surface Facilities FEED Project, which includes: oil gathering system, gas oil |
|separation plant and export trunkline; |
|Tripoli Main Terminal FEED Project – export terminal of fuels, including transport pipelines |
|from facility Zawia terminal – sea shore to main terminal and from main terminal to Tripoli|
|airport; |
|Duties: |
|Assures that design continuity is maintained throughout the entire project. |
|Responsible for developing piping design estimates, schedules and staffing requirements. |
|Responsible for developing piping design administrative and technical practices, |
|specifications, and procedures |
|Coordinates piping design activities with other design and engineering groups. |
|Identifies deviations in job scope, estimates magnitude of changes, and initiates deviation |
|notices. |
|Monitors and controls budget, schedule labor hours, costs, deviation notices, and progress. |
|Prepares and distributes design instructions pertaining to plant design requirements and |
|drafting procedures. |
|Represents piping design in meetings with suppliers, subcontractors, licensors, clients, and |
|other Company disciplines, and produces documentation required for conference or meeting |
|notes. |
|Jan. – Feb. . |PM Lucas Enterprises Ltd. |Kazakhstan |
| Senior Piping and Pipeline Engineer |
|Involved in designing and construction supervision of piping and pipelines, of the following |
|projects: |
|Chinarovsky oil field – Reservoir pressure maintenance system EPC project, which includes: |
|water gathering system, water treatment facility with pump station and water injection system;|
| |
|Involved as: |
|Main design engineer for piping and pipelines; |
|Few characteristics of this project: |
|Water gathering – PVC lines low pressure; |
|Water injection – fiberglass lines – high pressure; |
|Komsomolskoe oil field development project – EPC project client OMV, which includes: oil |
|gathering system, water injection system, gas reinjection system, central process facility, |
|oil pipeline – km long through muddy and flooded terrain – km of the water surface, |
|oil receiving station with oil preparation equipment for oil export reservoirs, pumps, |
|heating and metering; |
|Involved as: |
|Design engineer for piping and pipelines; |
|Senior construction engineer; |
|Few characteristics of this project: |
|Remoteness; |
|Sour service; |
|Muddy and flooded terrain; |
|High pressure ANSI class gas reinjection lines; |
|Also involved, during this period: |
|Project meeting with client; |
|Construction project meetings with local subcontractors; |
|Construction schedules; |
|Feb. – Jan. . |PM Lucas Enterprises Ltd. |Kazakhstan |
| Intermediate Piping and Pipeline Engineer |
|Involved in designing of the following projects: |
|Komsomolskoe oil field – EPC Oil Field Development Project client OMV, |
|June to January . |
|Karazhanbas oil field gas utilization project phase I – gas compression and treatment; |
|April – September |
|Aryskum facility at testindustrial exploatation oil gathering system – phase |
|additional; January to February |
|Involved as: Main design engineer for piping and pipelines; |
|Aryskum and Kyzylkia oil fields – upgrading of existing gathering systems – connection of |
|existing wells to existing satellites ; November to December |
|Involved as: Main design engineer for piping and pipelines; |
|Aryskum facility at testindustrial exploatation oil gathering system – phase ; October |
| |
|Involved as: Main design engineer for piping and pipelines; |
|Kyzylkia – detail design of power supply solution for Kyzylkia BKNS new diesel generator; |
|September |
|Characteristic of this project: |
|Equipment done by GOST standards & piping done by ANSI standards; |
|Kumkol South oil field – modification of Kumkol formation pressure maintenance system |
|distribution injection lines water injection; August |
|Konys – Kumkol pipeline project – upgrade of existing Konys CPF central process facility by |
|addition of new pumping equipment, new metering facility, pigging facility and pipeline to |
|Kumkol facility; May to July |
|Aryskum, Kyzylkia & Maybulak oil fields – upgrading of existing gathering system; |
|February to April |
|Characteristic of this project: |
|Done according to GOST standards; |
|Kumkol South oil field – modification of formation pressure maintenance system installation |
|of water distribution manifold at GS and distribution injection lines; February |
|Characteristic of this project: |
|Done according to GOST standards; |
|Maybulak oil field – upgrading of existing gathering system – new flowlines, trunkline and |
|satellites; September January |
|Involved as: Piping design engineer; |
|Few characteristics of this project: |
|Piping according

Cancel
Not Enough Credits
Sorry, but you don't have enough credits to download this resume.

Purchase more credits
Not Available
Sorry but this resume is not available for download. Please choose another!

Close
Confirm Download

Would you like to download  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again
Confirm View Complete Resume

Would you like to view  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again