Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for Agus M. for Engineer / Engineering Services in Bekasi, Indonesia. Search More Resumes for Engineer on Resumark.com #26FKDRBQ9
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for Agus M. for Engineer / Engineering Services in Bekasi, Indonesia




Occupation: Engineer Industry: Engineering Services
Country: Indonesia City: Bekasi
State: Jawa Barat ZIP: 17510



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
PDF]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
CURRICULUM VITAE
Name : Agus M.
Address : Bumi Sani Permai BSP Blok C No.
Bekasi – , Jawa Barat, Indonesia
Phone : + or +
Email :
Place & datebirth : Garut, October ,
Computer Literate :
Office Application
: MS Office Word, Excel, Powerpoint, Project, etc,
Design & Graphic
: AutoCAD D, D Maks , Macromedia Flash , etc.
: Web design, CMS Joomla, Wordpress, Blog,
Programming
: Visual Basic, Fox Pro.
Data Base
: MS Access, SQL Server, MySQL Server
Others
: High Speed of Blind Typing about word per minute wpm
With error factor %
Hobby:
Travelling, Music, Electronics, and Computer.
Objective:
> Achievement of ISO : Certification as QMR position at Month Document and
Process Development.
> Establish the Quality Control and Inspection Procedure for Heat Treatment of Aircraft Spare
Part through AMS D Standard NADCAP requirements, ASTM and JIS Standard for
Material.
> Establish Pyrometry Measuring for Furnace use AMSD as a base standard for
NADCAP Acreditations.
> Reduce Part Inventory using Part Stock Control Base on Lean Manufacturing Just In time
Kanban system
> Increase Machine Efficiency through Advance Production System adoption from Toyota from .% become
.% at second semester
> Localization of part order with redrawing machine part from japanesse to Indonesian using AutoCAD program as
a tool drawing.
> Establish computerized integrated database of Product, from the receiving, product processing
and final inspection.
> Advantage : Reduce tack time for input data, process data and traceability of product.
Reduce manhour, saving cost about $ per month
Education Background:
Bachelor degree S of Metallurgical Engineering from University of Jendral Achmad Yani
UNJANI, Bandung West Java Indonesia with GPA . of scale .
Work Experience Resume:
. Work in PT. BMC as a Production & QC Engineering staff
Kind of Product: Brake Drum, Flywheel, Disc Brake, Pulley
o Process sheet, Control Cycletime, ideal time, Checksheet, WI, SOP, etc.
o Project Proposal feasibility study
o In House Training: Kaizen, Safety equipment, Basic of Management, Leadership, electrical, TQC, etc.
o Be a trainer of Quality Control Training Program
. Work in PT. Selamat Sempurna Tbk. as a Process Engineering staff
o Implementing QS System: PPAP, FMEA, MSA etc.
o Control of Process Cycle time, SOP, WI, Tooling Design etc.
o Maintenance & troubleshoot of Crimping Machine Hydraulic & Pneumatic System.
. Work in PT. NSK Bearing Manufacturing as a Senior Engineering Staff April –June
Kind of Product: Miniature Small Size Bearing
o Implementation of QS System and involve in a multi team project for Upgrading
to ISO/TS system through process approach, and PDCA Cycle of Quality
System and trained as Internal Auditor.
o Control of Process Cycle time, SOP, SOM, Tooling Design etc.
o Control of machine maintenance by using TPM, and APS Advance Production System with three
point approach, Just In Time JIT, Automation and Continual Improvement.
. Work in PT. Stilmetindo Prima as an Supervisor June until present
Kind of Product: Specialty Alloy Steel Stockiest & Heat Treatment
o Troubleshoot and Maintain Furnace to prevent Breakdown, Control and Inspection of
Furnace using Pyrometry Measuring base on AMS D as a part of NADCAP
Accreditation program.
o Establish Computerized integrated database of Product, from the receiving, product
processing and final inspection of Heat treatment Process.
Advantage : Reduce tack time for input data, process data and traceability of product.
Reduce manhour, saving cost about $ per month.
o Establish Total Productive Maintenance for Furnace Equipment and it’s utility, with
adoption of some tool such as : Just In Time, Kaizen Continuous Improvement,
Preventive and predictive maintenance.
o Establish Quality Management System base on AISIN Requirement and AMS Specification ,
NADCAP Acreditation AQS AC , etc.
o Establish Furnace Maintenance and Calibration Standardization using Pyrometry
Standard base on AMS and CQI
|List of Training |February PT. Braja Mukti Cakra Bekasi |
| |Basic Management and Leadership, in house training, day |
| |How to Use QC Tools |
| |Basic thinking of Management and Leadership |
| |March PT. NSK Bearing Manufacturing. Bekasi |
| |SPC Statistical Process Control, In house training, day |
| |Short Term and Long Term Study |
| |Difference between Cpk Capability Index , Ppk Performance |
| |Index |
| |January PT. NSK Bearing Mfg & Bumi Arasy Consultant. |
| |Bidadari Island |
| |Outbound Management Training, day |
| |Fun Games of Management Philosophy |
| |Build Teamwork and Individual management attitude |
| |April PT. NSK Bearing Manufacturing. Bekasi |
| |MSA Measurement System Analysis, In house training, day |
| |ANOVA, Gauge R n R, Stability of measuring equipment |
| |Calibration of Measuring Equipment |
| |April PT. NSK Bearing Manufacturing. Bekasi |
| |Upgrading QS to ISO TS , In house training, day |
| |Difference between QS and ISO TS |
| |Basic Concept of Quality System Management due to PDCA Cycle by |
| |process approach |
| | – June PT. NSK Bearing Manufacturing. Bekasi |
| |Internal Quality Audit, In house training, day |
| |Internal Audit Base on ISO/TS Concept |
| |Include Live Audit on Plant |
| | Dec PT. Stilmetindo Prima. Bekasi |
| |ISO : Awareness, Sentana Consulting, day |
| | Jan PT. Stilmetindo Prima. Bekasi |
| |ISO : Documentation, Sentana Consulting, day |
| | Jan Sentana Consulting Jakarta |
| |ISO : Internal Auditor, Sentana Consulting, day |
| | Apr PT. Stilmetindo Prima. Bekasi |
| |QCDSM Training, In house training , day |
| | Feb BSI Indonesia. Jakarta |
| |Introduction ISO :, PAS, BS, BSI Indonesia, |
| |day |
| | |
| |Nov Sentana Consulting. Jakarta |
| |ISO : Internal Auditor, Sentana Consulting , day |
| | – Jan Goodrich Pindad Aerospace Indonesia,. Bandung |
| |NADCAP Acreditation & Pyrometry Standard Guide base on AMS |
| |D, Goodrich Pindad Aerospace Indonesia , day |
Current Job Description :
. Quality Control and Inspection of Material Standard with Reference standard such as :
AMS D, ASTM, JIS etc.
. Maintain and problem solver of Integrated database system.

Cancel
Not Enough Credits
Sorry, but you don't have enough credits to download this resume.

Purchase more credits
Not Available
Sorry but this resume is not available for download. Please choose another!

Close
Confirm Download

Would you like to download  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again
Confirm View Complete Resume

Would you like to view  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again