Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for DEBASIS B. for Engineer / Engineering Services in Edgbaston, United Kingdom. Search More Resumes for Engineer on Resumark.com #37SCB6TRO
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for DEBASIS B. for Engineer / Engineering Services in Edgbaston, United Kingdom




Occupation: Engineer Industry: Engineering Services
Country: United Kingdom City: Edgbaston
State: Birmingham ZIP: B16 9JU



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
MS WORD]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)

Curriculum Vitae 

Name of Staff DEBASIS B.
Date of Birth // Nationality INDIAN
Contact No + M Email

 

Education:

Masters in Civil Engineering Specialisation in Soil Mechanics & Foundation Engineering, Jadavpur University, Kolkata, India 

Bachelor’s in Civil Engineering, North Bengal University, West Bengal, India

Employment details

Employer SCOTT WILSON LTD, BIRMINGHAM, UK
Year July to Contd
   
Projects handled
 
  • Tsuen Wan Drainage Tunnel, Hong Kong
  • Activities Performed/ Detailed Task Assigned
    Finite Element modelling and SCL temporary support design for km, .m ID drainage tunnel, inlet caverns and access adits in mixed ground conditions.  Numerical analysis of tunnels at critical stretches based on rock cover, identifying the critical parameters for design, identifying the zones of potential failures, planning excavation sequences and providing numerical modelling inputs for design of tunnel linings. Analysis was also carried out on critical intersections with multiple openings to identify the potential failure zones in rock pillars between openings as part of this detailed design. All analyses were performed using Phase FE software.
     
            .   A Expressway, Sandwell Metropolitan Borough Council
    Activities Performed/ Detailed Task Assigned
    Checking capacity of bored piles under foundations of footbridge for both axial and uplift loadings.
    Checking forces and movements in secant piled walls, supporting vertical walls in excavated areas using PLAXIS.
    CAT II check of secant pile walls, steel sheet pile walls, Bridge foundation bearing capacity & settlement along different sections of Grade separation interchange.
       
           .  Westbourne ParkCrossrail Project
    Activities Performed/ Detailed Task Assigned Performed preliminary analysis of contiguous bored pile wall using WALLAP at different sections to evaluate stiffness, deflections of wall and predicting moments and forces in wall. Also performed detailed FEM analysis of wall sections at different retained heights using Plaxis.

    Detailed analysis of pile group using Repute software to support new gantry girder legs.

            . Tottenham Court Road Station Upgrade, Crossrail Project
    Activities Performed Geotechnical modelling of new SCL tunnels in London Clay for independent CAT III design checks.  Finite Element analysis of complex crosssections comprising multiple new SCL tunnels, existing London Underground Tunnels and new deep excavations for ticket hall structures.  Assessment of tunnelling induced ground movements and the impact of tunnelling on existing tunnels including existing cast ironlined escalator barrels.  Analysis was carried out using Plaxis software to provide lining forces and moments for stability and structural lining checks.
       
  • Humber Gateway: Metmast Seawind Group
  • Activities Performed Analysis of Monopile supporting Met Mast for an offshore wind farm using ALP & LPILE softwares.
     
    .  M widening scheme, Highways Agency
    Activities Performed Analysis of wall sections along highway alignment for different retained heights & options. Identifying geotechnical design parameters, methodology, risks and construction considerations. Preparing summary reports to assign geotechnical design parameters, forces & movements in wall sections along with preparation of risk register.
       
           . Liverpool Street Powerlink Crossrail project
    Activities Performed Geotechnical interpretation and Finite Element FE modelling of primary and secondary SCL support for the independent Category III design check on a new SCL cable tunnel and shaft linking into existing underground infrastructure at Liverpool Street Station.  Numerical modelling was carried out using the Plaxis software to model the excavation and installation of SCL support in several stages and to assess the forces and moments exerted on primary and secondary support. 

    Analysis included consideration of the transmission of loading onto the sprayed lining against earlyage strength gain of the SCL as well as modelling of permanent SCL support under longterm loading.  Sprayed concrete linings for the shaft and tunnel are to be formed using steel fibre reinforced concrete.

       
    Employer SMEC INDIA PVT LTD
    Position Held Geotechnical Engineer
    Year Feb to July
    Activities Performed/ Detailed Task Assigned

    Kameng Hydroelectric Project

    Review of failure on Powerhouse excavation cut slope and redesign of proposed slope stabilisation methodology by Slip circle analysis using SLOPE/W software. Also performed design of bored piles for slope stabilisation including preparation of design report and specifications.

    Rhotang Pass Highway Tunnel

    Review of Geotechnical inputs for Numerical analysis on proposed Xsection of tunnel. 

    Srinagar Hydroelectric Project

    Preparation of slope stabilisation reports on cutting of proposed powerhouse slope, Preparation of spreadsheets for Plane wedge analysis and wedge analysis by SWEDGE software.

    Preparation of slope stabilisation reports on cutting of proposed dam excavation cut slope, Preparation of spreadsheets for Plane wedge analysis and wedge analysis by SWEDGE software.

    Numerical modelling and analysis SCL supported head race tunnel intake portals, transition, junctions and main tunnels.  Design work included recommendations for excavation sequences and support recommendations with analysis carried out using Phase software.

    Check of Slope cuts by SLOPE/W software for excavation profiles in construction areas.

    Panan Hydroelectric Project

    Design of concrete liner of HRT tunnel for hydro project as per Bedded Beam model using STAAD PRO ’.

    Preparation of report on foundation improvement of CFRD dam using Vibroflotation method.

    Employer MOTT MACDONALD INDIA Pvt. Ltd
    Year June’ TO Jan’
    Position Held Senior Engineer
    Activities Performed/ Detailed Task Assigned

    Luhri Hydroelectric Power Project, MW

    Preparation of estimation of HRT tunnels against different options of studies, preliminary cost analysis, and theoretical gaugedischarge curve, Energy calculations at % & % dependable year, preparations of tender documents for geotechnical investigations and topographic surveys. Construction planning & Schedule of tunnels regarding DPR preparations.

    Middle Vaitarna Hydroelectric Power Project, MW

    Reviewal of feasibility report including cost analysis, power study and water availability.

     
    Employer NATIONAL HYDRO ELECTRIC POWER CORPORATION LTD.
    Name of Project Subansiri Lower H.E. Project. MW
    Year June’ TO May’
    Position Held Engineer
    Activities Performed/ Detailed Task Assigned

    Modelling, numerical analysis and design for SCL and insitu concrete linings to hydroelectric tunnels.   Numerical analysis of junctions along pressure shaft with prediction of displacement values and extent of failure zones.  Analysis of displacement and prediction of plastic zones at junctions of surge chamber and head race tunnels using FLACD software.  Analysis of displacement and prediction of plastic zones at junctions of twin underground head race tunnels in highly stressed regions.

    Analysis and structural design of diversion tunnel inlet using bedded beam models.

    Development of the excavation sequence and support measures for surge chamber along with design of necessary support.  Analysis of excavation and support using FLAC and Phase software.

    Preparation of Finite Element models for underground caverns in weak rock. Interpretation of modelling results to develop optimum support design along with criteria to monitor deformations and extent of yielded mass.  Analysis of excavation using FLAC and Phase software.

    Development of estimated quantities for excavation, insitu concrete, SCL, reinforcement and other support arrangements for a variety of underground structures.

     
    Employer CONSULTING ENGINEERING SERVICES INDIA PVT LTD
    Year May’ TO May’
    Position Held Assistant Engineer
    Activities Performed/ Detailed Task Assigned 


    Cancel
    Not Enough Credits
    Sorry, but you don't have enough credits to download this resume.

    Purchase more credits
    Not Available
    Sorry but this resume is not available for download. Please choose another!

    Close
    Confirm Download

    Would you like to download  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again
    Confirm View Complete Resume

    Would you like to view  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again