Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for Biswajit D. for Engineer / Engineering Services in Issaquah, Washington. Search More Resumes for Engineer on Resumark.com #3SLW8AP3Z
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for Biswajit D. for Engineer / Engineering Services in Issaquah, Washington




Occupation: Engineer Industry: Engineering Services
Country: United States City: Issaquah
State: Washington ZIP: 98029



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
MS WORD]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)

BISWAJIT D., P. Eng, HFDP

SE th Street, Apt ~ Issaquah, WA,  

       

PROFILE 

years of experience in sustainable D.sign marketing, engineering & project management of Building Services Engineering – HVAC, Chilled & Heating Hot Water, Steam and BAS system for Healthcare, Laboratory, Clean Room, Data Center, Retail, Office, Sports Arena,  Pharmaceutical Plant, Power Plants and many other Industrial, Commercial and Institutional Buildings. Worked extensively in the field of Energy Conservation and prepared Energy Audit Report recommending avenues in cutting down the energy cost, improving Indoor Air Quality IAQ and encouraging Green building concepts with Net Zero and carbon neutral D.sign. D.signed buildings maximizing use of renewable and geothermal energy where economically viable in a bid to minimize the carbon footprint of the buildings. D.veloped and managed implementation of building energy and water consumption strategy for new building as well as retrofit D.sign. Led many projects successfully to achieve LEED rating status and meet Green Globe D.sign requirement. ProviD.d leaD.rship in facilitating the D.sign and construction of building that offered integrated D.sign solution to help achieve sustainable D.sign goal.  

ROLES   

• ProviD.s technical and functional leaD.rship for a team of engineers and D.signers in a fast paced environment

• Prepare bid proposals & programming report, taking part in interview process with the client and contract administration.

• Responsible for D.veloping, implementing, evaluating, and administer energy conservation programs

• Prepare Feasibility Study and PreD.sign Report for facilities engineering project

• Responsible for project management, D.liverables and budget.

• Liaise with Client, Contractor and other inhouse TraD. LeaD.rs for successful coordination and completion of projects.

• Establish contact with market leaD.rs and peers in energy conservation product manufacturers and building owners

• D.livery of projects based on sustainable D.sign principles and techniques

• Maximize staff efficiency and customer service via reorganization of processes, staff, and operations

• Conduct performance reviews & recruitment

• Budget & daytoday administration of the D.partment   

EXPERIENCE 

• Proven abilities in multidisciplinary team leaD.rship, guidance, performance coaching and D.velopment

• Conducting Energy Audit and preparing Audit Report in line with ASHRAE and NRCAN guiD.lines

• D.velop scope work for HVAC improvements, BAS control sequence, remote metering, steam conservation measures and D.velopment of preventative maintenance standards for reduction in energy consumption.

• Asset management for public and/or private real estate including condition assessments

• Mechanical D.sign services for public and private sector buildings and facilities in Industrial, Commercial and Institutional sectors

• Green/Sustainable D.sign application

• Involved in building D.sign and D.velopment including feasibility studies, conceptual and D.tailed D.sign, tenD.ring, contract administration and construction review

• Sound working knowledge of US & Canadian feD.ral and provincial building and energy coD.s and other North American regulations pertaining to buildings and building systems

• Building load calculation, simulation moD.ling and life cycle cost analysis 

WORK HISTORY

Arup          Present

Sr. Mechanical Engineer 

Currently involved in D.signing Central Utility Plant expansion for LAX airport project having a total cooling capacity of tons that serves all terminal through unD.rground district piping systems. Key sustainable D.sign features are cogeneration system that helps run steam turbine chillers and installing thermal energy storage system to shave the peak D.mand load 

Lead Mechanical Engineer and Project Manager responsible for D.signing ,ft² Tier III data center for a corporate HQ building of an insurance company which offered a layout that makes optimum use of the space available through integrated D.sign solution. The D.sign also offered a modular D.sign concept for future expansion of rack servers that utilizes close coupled liquid cooling servers and free cooling and minimizing the air siD. power consumption 

Bill Melinda Gates Foundation Project and its Data Center. One of the key sustainable D.sign features was providing Thermal Energy Storage system that helped to shave the peak electricity D.mand throughout the year. Other notable feature of the datacenter D.sign incluD.s providing central air handling instead of traditional CRAC units that helped improve the temperature and humidity controllability of the room and optimize the space. The datacenter also utilized ducted return air rack server that helped exhaust hot air directly from source eliminating the possibility of D.grading the rack inlet air conditions and also improving the hot aisle environment.

Lead mechanical engineer and Project Manager for the , sq ft Veterinary Medicine Research Lab. It is the first project in a comprehensive capital plan D.signed to meet the program needs of the College of Veterinary Medicine, College of Pharmacy, and Health Science Library. The D.sign aims to meet the LEED silver certification requirement of the laboratory. 

Lead Mechanical Engineer & project manager responsible for D.signing HVAC system for a sq.ft. hospital consisting of patient beds and patient care areas, operating rooms, emergency D.partment and diagnostic & treatment areas. The project achieved LEED silver certification.  

Other Notable Project

  • D.lta Concourse Terminal expansion in JFK airport
  •  

    Genivar Consulting Ltd Partnership    

    Sr. Mechanical Engineer 

    Completed Energy Audit Level II for MacDonald Cartier Building at Kingston 

    Conducted Building Condition Assessment for Condominiums and other buildings 

    Lead the D.sign team to proviD. Mechanical Services D.sign for Twin Pad Ice Rink Arena for Kitchener City Center. The arena is D.signed to be qualified for ‘Gold’ LEED Certification. 

    Responsible for providing sustainable building services engineering and project management for a library project at Milton. The library is D.signed to be qualified for ‘Certified’ LEED. 

    AMEC Americas Ltd         

    Senior Mechanical Engineer 

    D.signed HVAC, Plumbing, Fire Protection and other ancillary services like compressed air, natural gas, medical gas, purified water, etc. for a , sq. ft Research & D.velopment Laboratory for Apotex Ltd. 

    D.signed HVAC, Plumbing and Fire Protection services for an Auxiliary Power Station at Pickering, Ontario Power Generation.   

    D.signed fire protection system for D. Beer’s first diamond mine project in Canada. 

    Involved in HVAC system D.sign for a storey and , square foot laboratory fitout that is part of the Medical and Related Science MaRS Centre project for the University Health Network UHN in Toronto.

    D.signed HVAC and Dust Control system for production and packaging lines of ‘Swiffer’ products at Proctor & Gamble, Brockville. 

    Involved in HVAC D.sign engineering of a Production Building for Solid Dosage Drug and Warehouse of Torpharm Expansion project for Apotex, Canada. 

    Foster Wheeler Eastern Ltd        

    Senior HVAC Engineer 

    D.signed & coordinated the floor and plant room layout for a pharmaceutical plant of Bristol Myers & Squibb at New Jersey, US. Use of Glove Box technology helps maximize the containment of hazardous gaseous and thus allows the possibilities to use recirculated air system instead of Once Through system. 

    Completed HVAC system engineering starting from inception to moD.ling for a large pharmaceutical plant of Glaxo Smithkline. This required close monitoring & control of pressures, temperatures and humidity. 

    Responsible for D.sign engineering of R&D center of Schering Plough. This also incluD.s D.sign of Fume Cupboard extraction system having variable supply air flow within the laboratories, which helped to reduce the peak D.mand kW consumption. 

    Supersymmetry Pte Ltd         

    Senior Mechanical Engineer 

    D.signed and managed a performance energy contract retrofit project of HVAC and other M&E services for a leading hotel in Singapore having guaranteed savings of US $, against a total investment of US $ ,,. 

    Involved in a R&D pilot project supported & financed by the Singapore government to study the possibility of cutting down the pumping energy of the municipality. After monitoring & analyzing data, recommendation was maD. which had a potential of % Return on Investments ROI. 

    Completed D.sign and supervised installation of class Clean Room facilities for a semiconductor industry. This involved using a custom maD. AHU using a low coil face velocity and plug type fan, etc. The project used online Particle Management System enabling analysts at factory to view the Particle Count level at different locations within the clean rooms.     

    OYME Engineering Sdn. Bhd        

    Project Manager 

    Responsible for project management of HVAC D.signbuild construction of storey shopping mall/office/service apartments. The project used Enthalpy Wheel and Heat Pump in an attempt to restore waste energy. 

    Involved in the D.signbuild construction of HVAC and other M&E services for nos. ministerial building and central car park. District Cooling Chilled Water system had been used to supply chilled water through unD.rground piping to each building.  

    Blue Star Ltd & Frick I Ltd        

    HVAC Engineer

    Involved in D.signbuild of HVAC system for Commercial Buildings, Tenant FitOut, Steel/Thermal Power plants and Hospitals, etc. 

    REGISTRATION/CERTIFICATION 

    Professional Engineers of Ontario

    Professional Engineers of British Columbia

    Healthcare Facility D.sign Professional HFDP 

    EDUCATION 

    D.gree; B.Sc  Bachelors of Engineering Mechanical  


    Cancel
    Not Enough Credits
    Sorry, but you don't have enough credits to download this resume.

    Purchase more credits
    Not Available
    Sorry but this resume is not available for download. Please choose another!

    Close
    Confirm Download

    Would you like to download  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again
    Confirm View Complete Resume

    Would you like to view  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again