Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for Steve M. for Engineer / Engineering Services in Rayong, Thailand. Search More Resumes for Engineer on Resumark.com #WAMXXEM6J
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for Steve M. for Engineer / Engineering Services in Rayong, Thailand




Occupation: Engineer Industry: Engineering Services
Country: Thailand City: Rayong
State: Rayong ZIP: 21000



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
MS WORD]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
 

STEPHEN JOHN M.

Alwyn Avenue Postal Address         Current Address – Rayong, Thailand

Litherland

Liverpool

L NY 

MARITAL STATUS:        SINGLE 

NATIONALITY:        BRITISH 

TELEPHONE:                        +    

EMAIL:             

WEBSITE: please view for complete experience profile     ..co.uk 

DRIVING LICENSE:        FULL UK 

PROFILE: 

A hard working multi skilled and conscientious individual, who is capable of using his own initiative when necessary, and works well in multinational & multifunctional teams, yet is equally at ease on his own, being proactive, takes initiative also has ability to work under pressure and meet deadlines.

EDUCATION: 

Diploma of Higher Education in Engineering      in Progress

Working towards BA/BSc Open University Degree 

Bewsey High School Warrington:                         

Art, English, Maths and Technical Drawing            CSE GCSE 

Further Education:

North Cheshire College Padgate 

C & G Engineering                  

Deeside College Chester:

AutoCAD LT Design & Construction                                            

Business IT & Computing Knowledge:

Microsoft: Word, Excel, PowerPoint, MS Project &

Autodesk: AutoCAD , AutoCAD , Autodesk Inventor Essentials,

Autodesk Navisworks 

Additional Information

  • Welding experience to date has been working with Stainless & Carbon Steel’s using TIG, MIG and MMA mm – mm thickness.
  • CSWIP . Visual Welding Inspector ..
  • Conversant with AMSE, BS EN , EN , EN , EN
  • SCATS CCNSG  No
  • EMPLOYMENT HISTORY 

    AE&E Inova AG – Progressive Germany Ltd

    Water Steam Cycle Pipe Erection & Pressure Testing Supervisor  Jan – Present 

    On completion of the boilers I was transferred to assist with the erection and pressure testing of the entire pipelines on the WSC systems, reviewing the P&IDs and all ISOs for correct installation of all systems prior to final inspections with the client and then releasing the systems for pressure testing to BSEN , finally completing the PT Test Pack Documents for hand over to the client.  

    Boiler Supervisor            Aug – December  

    During the role of Boiler Supervisor Stephen was employed after the project had already started which meant he had to get involved very quickly with the coordination off all daily boiler erections activities and work schedules, working very closely with the site management team Duro Dakovic Croatia. at times over men on site working on the boilers 

    Successful boiler pressure test line in Newhaven!!!! Information from AE&E

     

    Today we have successfully passed the boiler pressure test for the second boiler!!!

    Despite a delayed start on site in mid March, the Newhaven project team has managed to execute the two boiler pressure tests now two weeks ahead the contractual schedule. This second pressure test is a big client payment milestone and it was important to achieve it in November so that the payment can be made in . The already tight schedule with a month erection time for a two line plant was accompanied by the usual difficulties of late deliveries, interrupted working progress and unprepared subcontractors for English construction sites.

    Our special thanks go to the Newhaven Site Team which did anything possible in the last month to achieve the milestones.  
     

    ASL Industrial Solution Co, Ltd Thailand

    Project/Installation Engineer                   Feb – January

    Final structuring of the new company in Rayong, offering the services of Air Cooled Heat Exchanger &  Fin Fan Optimization, Service/Installation & Repair.

    Completing site surveys within the oil and gas industry in all parts of Asia MalaysiaPhilippinesIndonesia & all other parts of Thailand submit site proposals and complete RFQ –Tenders for the clients.

    Supervising & overseeing the installation of Air Cooled Fin Fans and all associated piping systems.

    Employing the new engineering staff for the company and setting out the new quality and engineering procedure documents and the new marketing strategy for the procurement of new orders. 

    ASL Air Exchanger Service Ltd Middleborough 

    Quality Manager/Assistant Project Manager                                           July – Feb  

    N.U.R Power Station Kulim Hi Tech Park, Malaysia

    Duties: Project Management & Supervision of the refurbishment on an ACC Air Cooled Condenser – under vacuum.

    This project is the first of its kind that we know of ever to be completed on a GEA AFramed vacuum condenser; it consisted of installing stainless steel repair sleeves by means of the Hydro Loc Expansion Process.

    The sleeves have been installed in the condenser due to the corrosion of the existing condenser tubes.

    Tasks involved producing the project engineering schedule and updating weekly, submitting weekly and monthly reports to the clients OnSite Engineering Consultants SKM – Sinclair Knight Merz.

    Produce the quality plan and arrange welding procedures in conjunction with the local welding inspectors so that the welding could be completed in line with the clients site procedures, all welding completed was with T.I.G manual welding process , mtrs of C/S & , mtrs of .mm St/St to mm C/S.

    Arrange meetings with local subcontractors and place orders for the engineering work to be completed, control of all engineering staff on site.

    Over see the hot commissioning by others and sign off all the QA documentation for the project ready for hand over to the client via approval from the clients OnSite Engineering Consultants SKM – Sinclair Knight Merz. 

    RJM International ltd Winchester               Aug – June    

    Mechanical & Installation Supervisor/Assistant Site Manager           

    AES Kilroot Power Station Belfast

    Duties: Management & Supervision of all mechanical installation works within the boiler and coal crushing mills, commissioning and mill balancing and boiler optimization, completion of as built drawings. Attending daily and weekly site meetings, updating the client with weekly reports and progress schedules, supervision of all mechanical fitters and welders, submitting method statements & Risk assessments for approval, and compiling the Project CDM H&S File ready for the final handover via approval from the clients OnSite Engineering Consultants PB Power to be passed on to the client for contract completion. 

    N G Johnson LTD & Ensign Site Services Ellesmere Port   Jan – Aug  

    Mechanical Erection Supervisor/Project Engineer:  London           

    Duties: Supervision of the installation of a new Clinical Waste Incinerator for Grundons Waste Management Ltd in London, work scope encompassed, attending daily and weekly site meetings, updating the client with weekly reports and progress schedules, supervision of all cranage heavy lifts, Steel erectors, mechanical fitters and welders, method statement approval, receiving and updating drawings to suit new plant modifications, hot commissioning and final plant hand over to the client. 

    NPTC – ASL Thailand         Oct – Dec  

    Mechanical Supervisor                                                             

    Duties: Supervision of the refurbishment off air cooled heat exchangers at IRPC Petro Chemical Plant & PTT Petro Chemical Plant Rayong on their annual turnaround assisted by the NPTC Mechanical work force based in Rayong. 

    Ensign Site Services Ellesmere Port                May – Oct  

    Position: Mechanical & Installation Supervisor                        

    Schott Jena Glass, GmbH, Germany Cleanaway Incineration Plant, Ellesmere Port

    Corus Strip Steel Plant, Deeside Sanden, Die Cast plant, France  

    Various fabrication/installation and commissioning works on a Camlaw Furnaces/Clinical and Chemical Incinerators during the annual plant shutdowns at the above sites 

    Henkel Consumer Adhesives Winsford           March March    

    Position: Projects Engineering Draughtsman & Sub Contractor Coordinator                            CDMProject Connect , Construction of new , sq ft machinery and distribution centre

    Duties:  To produce machinery drawing layouts for the positioning of new plant and relocation of existing plant, including new Stainless Steel vessels, pumping systems, air, water and gas services for the plant and machinery.

    To produce layout drawings for the planning supervisor to approve prior to submission to the local authorities for acceptance of the new building and also change of use notices, including the following, new effluent pit c/w new foul drainage, compressor/transformer house, sprinkler system, water holding tanks and subsequent services for the distribution centre and toilet block extension.

    To procure fixed price quotations from manufacturers for the supply of new Stainless Steel vessels, new pipe work and pumping systems, place subsequent purchaser orders, expedite/inspect and sign off the manufactured items at the supplier manufacturing base.

    Also appraise and obtain fixed price quotations for the installation and resiting of all plant and machinery from sub contract site installation companies.

    Produce working programmes of installation of all items of equipment, ensure receipt of all necessary method statements and risk assessments from sub contract companies and carry out random contractor safety audits, control and issue permit to work and hot work permits to contractors. 
     

    SJM Projects Ltd Wrexham                                  

                                                

    Design and installation of Stainless Steel and Carbon Steel vessels, pipe & pumping systems, supervising all trades including coded welders, fabricators, fitters and riggers, procure materials and organise daily work schedules for fabrication and plant shutdown on client sites, marketing and bringing in new enquiries/tenders, estimating and converting tender documents into firm orders. 

    Chester Fabrications Ltd Wrexham                                                                                                &nbs


    Cancel
    Not Enough Credits
    Sorry, but you don't have enough credits to download this resume.

    Purchase more credits
    Not Available
    Sorry but this resume is not available for download. Please choose another!

    Close
    Confirm Download

    Would you like to download  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again
    Confirm View Complete Resume

    Would you like to view  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again