Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for Barun B. for Manager / Supervisor / Team Leader / Engineering Services in Abu Halifa, Kuwait. Search More Resumes for Manager / Supervisor / Team Leader on Resumark.com #ZDU9LVTI8
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for Barun B. for Manager / Supervisor / Team Leader / Engineering Services in Abu Halifa, Kuwait




Occupation: Manager / Supervisor / Team Leader Industry: Engineering Services
Country: Kuwait City: Abu Halifa
State: Al Ahmadi ZIP: 13003



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
MS WORD]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)

      Barun B.

      

      NAME:      BARUN B..  

      Nationality:    Indian.  

      Discipline     Project Management,

               Email:       
 

PROFESSIONAL Qualification / Membership:   

  • B.E. Electrical Engineering from Bengal Engineering College B.E.College, University of Calcutta, India. Year of passing: .with First Class.
  • Life Member of Indian Institute of Engineers. . MIE. , Chartered Engineer. CE, India.
  • Life Member of Kuwait Society of Engineers, Kuwait.
  • Computer MS office, outlook, MS Project, PTS, CAPTOR/EDMS Bechtel Software for load and relay coordination.
  •  

    SUMMERY OF PROFESSIONAL EXPERIENCE: 

  • Refinery /Petrochemical: years – Project Management/Construction Coordination of E&I Scope, Scrutinizing drawings, vendor proposal/ engineering audit for Electrical, Instrumentation, E&I detail study, Observation of non conformity in construction progress, developing inter phase matrix for interlinked activity, coordination Implementation of SOP testing, pre commissioning, commissioning activity, conducting Safety/technical audit, Recovery Commissioning contingency plan in slippage EIA / HAZOP /SOP group participation,
  •  
  • years Project Management /Power system Network/ Distribution, Testing/Commissioning of KV distribution network Switchgear, Transformers, KV UG/OH Cables, relay coordination, inspection of material as SAT/FAT, Testing/Commissioning/switchingof Sub Station. Having switching authority from Chief Engineer “Electrical Distribution NetworkMEW, Kuwait Ministry”. Conversant with international standard and safety procedure of electrical system maintenance, Project handled related with Thermal Power Plant, /desalination plant. DATA acquisition system communication with DCS. Emergency power system shutdown plan, auto changeover requirement, timing of emergency drop out system etc. KV GIS modification changeover, commissioning.
  •  
  • Management: Business development, service oriented product, JV and association with international groups, review of upcoming project /tenders in line with future concept of clients, implementation of cost/schedule based recovery plan to support ongoing projects.
  •  

    Career & responsibility in related areas: 

  • Career Started with Power Station project in India with BSES, transferred to Kuwait with MEW Shuwaikh Power station Project, Consultant Chas T. USA. Joined MEW Distribution of KV system, study schematic, testing the panel, relay, and substation, commissioning the system, fault finding and repairing of Transformer, UDS, O/L commissioning, maintenance, modification etc. Relay protection system for upstream and downstream, tripping time, fault level calculation, tripping interlocking, interconnected with annunciation and PLC logic control detail With DASData acquisition system with MEW EDN.
  • Associated with Refinery projectsContract ManagerMina Abdullah, Kuwait –DSU modernization & up gradation, MABRefinerySafety improvement project, replacing units with Hazardous classified equipments for   Crude and sulphur unit, introducing Pressurised Sub Stations, Frequency converter distribution network modify with PLC based shutdown system.
  • KNPC Shuiba refinery NEW CCR project, B&V Prichard, USA.
  • Petrochemical project with Polyethylene Petrochemical Plant, EQUATE, Kuwait.
  • Crude Tank Storage TEXACO in SAT/JO/KOC Crude Oil Tank project, Kuwait.
  • RPLRefinery Jamnagar associated Feed design study with Bechtel Engineers as EPMCby PTS Tracking for Design & study Normal, Emergency, critical load requirement Generator ATS, Battery Bank/UPS. Prepare shutdown plan, Tie in with emergency power in the system. Utility support, Inter phase coordination between Electrical/Instrumentation/Process/civil/ Mechanical groups.
  •  
  • Worked in Qatar NDIANew Doha International Airport Project for Jet Fuel A Fuel distribution System EPMC Bechtel Overseas, USA as EPC in CP Fuel System. Discussing engineering issues with Electrical, Instrumentation, safety, interface matrix, in line with FEED and engineering developments
  • Diesel Power and water desalinisation, Maldives, Consultant Beca Worly Newzealand.
  • Mott Macdonald Consultant PMC as Electrical, Instrumentation construction for Kuwait Airport Fuel System project, supply of Aviation Fuel from Ahmadi Refinery to a Tank Storage, maintain, pumping to airport hydrant system, FEED Design review with detail design, construction inspection, progress, Field Change, Coordination with all discipline.
  •  

    SERVICE DETAILS in reverse chronological order: 

    Since March, Joined Al Rashed Group, Kuwait . Working now with this Group  

    Joined PROJECTS MANAGER Senior Management GroupAl Rashed Group, . alrashedholdings.com. 

    Projects Management of on going and New Projects, Coordination with different Group, design support for Vendor supply materials, Tendering, Business Development with Power, Oil Sectors. On going Projects and works relates to,

    KOC Joint Operation KV Extension Project with AREVA GIS KVSWGR, Relay Protection by SIEMENS, Bus Bar Protection by Toshiba for, MEW.

    Construction Manager Electrical & Instrumentation –Kuwait Oil Company Construction, Commissioning, Operation of MBOPD Crude Gathering Early Production Facility EPF, Process design support by Process Unlimited, USA. Project in advance construction –Precommissioning stage.   

    Mott MacDonald, UK Al Rashed Sponsored Group in Kuwait PMC JET AFuel Collection, Storage, Distribution Hydrant system for Kuwait International Airport with M/S.Mott MacDonald, UK PMC, Consultant Engineer, Electrical & instrumentation work for KAFCOKuwait Aviation Fuel Company Project for detail design support, engineering audit, Material inspection approval, Installation, test Pre commissioning & Commissioning. Fuel supply Pipe KM Jet Fuel intake line for Fuel Depot Tank connecting with airport operation fuel hydrant system. Power/Instrumentation/Control, distribution, emergency power, instrumentation associated work, Building BMS, Security Management, in each area communicating through F/O cable, associated work included Leak detection, Jet Fuel pumping/Tanker loading and Operation Facility.

    July –February . 

    Project: NDIA New Doha International Airport Project, Doha, and Qatar.March Feb  

       EPCM: OBI Overseas Bechtel International, Company:  PLLPunjlloyd Limited,  

    Jet Fuel intake and distribution System Doha Airport Head of Electrical and Instrumentation Control System in NDIANew Doha International Airport ProjectCP, in Doha, Qatar. Interviewed by OBIOverseas Bechtel Incorporated and New Doha International Airport Authority Qatar. Joined as General Manager for Punjlloyd, Qatar. 

    Project EPC – Scope includes design, discussion with Bechtel Engineering Group in line with Feed, System approval, vendor approval/ coordination, Selection of equipment with deviation, discussion with Bechtel on approval criteria’s, Selection process to develop construction sub contractor, design supported by M/S J.P.Kenny, UK. Interphase with different contractors every week to match the work interphase, developing interphase detail between contractors. System includes power, instrument, F/O network communication linked with Data Highway. BMS, HVAC, access control, CCTV, Fire detection and control, building No in different areas. Continuous training conducted by Bechtel on HSE, Sigma Quality Control issues, Risk assessment to monitor project in line with Bechtel requirement.  
     

    National Petroleum Services Company K.S.C, , Kuwait. March ;

    Oil Field Services Company in Kuwait provides upstream and downstream service to KOC, KNPC and Industrial group in Oil and Power sector  Manager Projects, develop /diversification of business in oil field services refinery related project. Setting up of Environmental Division with Lab & Impact Assessment. Conducted study on Local Marketing of KNPC, Development with Limitorque actuators in house service support for MOV installed in Kuwait. Developed Project on MOV up gradation with refinery by seminar on improvement on Smart actuators in refinery, Power Station, SATTexaco Tank Farm Valves/Actuators replacement with smart master station.  Developing testing workshop for pressurised Cylinders approval received from DOT USA for Kuwait to work and certify highpressure cylinders as Testing for Halon Management System, testing and revalidation of pressurised fire fighting Cylinders in Ships in Kuwait Port. Developing, enlistment, received KNPC Rate Contract on Environmental testing on Air, Water and soil analysis work. Developed Environmental Lab in line with EPA Kuwait.

    Almeer Technical Services Co.W.L.L. ATSCO

    Oil Field / petrochemical/PowerStation major project execution company in Kuwait/ March;

    Position: Contract Manager for refinery/petrochemical and oil field related projects,

    Scrutinizing drawings for on going project with support and liaison between site and client, review Vendor data, documents on equipment with applicable technical requirement of the Marking/Classification on hazardous areas, group etc, design requirement.  Major projects , Mina Abdullah Refinery Design, develop Up gradation of safety system in old DSU refinery area with increases safety implementation, replacing with classified equipment, PLC based shut down system for .KV system, introducing pressurise S/S, inter tripping and activation of deluge with UV/IR detection on voting logic with fast acting addressable detection, annunciation and fire fighting system logged with CCR and SMS system.  

    Shuiba refinery Consultant Engineer Black & Vetch Prichard, Inc USA for Shuiba Refinery New CCR project. Drawing Study, review P & ID, supervision /project execution as PMC. Approval of drawing as IFC for construction, preparation /modify of drawing, analyses the submitted offers, technical evaluation, getting vendor detail related to review and approval. Developed electrical logic, update SLD on System feeding KNPC sub Station MEWKNPCGenerator supply interlock and delay activation with KNPC switch gear incomer and change over system. Coordination for study field Instrument, loop transfer from old CCR to new SSH – Updating records from old field input to new SSH Satellite House, Monitoring inspect Electrical equipment/DCS installation in CCR, instrument cable /marshalling cabinet/ BMS, explosion proof sound monitoring activation for CCR, Conducted HSE meeting /risk assessment/ review of safety and environmental non conformities to rectify the unsafe working process. 

    : Reliance Petroleum Ltd. RPL, Jamnagar, India. Design E.O.P. USA, Project Consultant Bechtel France. Position: Dy. General Manager Electrical 

    Refinery Project Implementation GroupJob involves –Study project detail, Scrutinizing tender/ drawing, Study each electrical / process equipment in line with project requirement to be delivered / follow PTSProject Tracking System in –Bechtel deliverables for drawing, Engineering audit for Hydrotreater/CDU/VDU and Crude unit for electrical/instrumentation interlinked issues, process requirement according to engineering standard, Worked with Bechtel Software EDMS Electrical Data Management System for system study of continuous/intermittent, standby loads & CAPTOR fault & relay coordination with priority load shedding system through PLC by ABB. Coordinating the relay setting for maximum stable & safe operation. Analysis the safety aspect on site, review and preparation of pre installation testing/maintenance place, group, workshop, testing equipments etc., introduction of SOPsafe Operating practice during precommissioning, commissioning and operation. Preparation of Budget/Manpower, spares, accessories, requirement for start up/commissioning & steady state group. Review P&ID for Package units’, check the detail for different VSD & Power recovery unit; attain FAT, startup/commissioning activity. Worked in “/.  

    Almeer Technical Services Co, W.L.L., Kuwait ATSCO   

    Oil sector and petrochemical Project Engineer in Kuwait “ to”

    Manager –Refinery Projects / support group, coordination with Tender and estimation dept. In charge for   refinery/petrochemical/oil field projects, reporting to MD, major projects are as follows; 

    KNPC, MABMina Abdullah Refinery, Kuwait for  “Revamp of old Crude Units in running refinery” in line with stringent shutdown planning, critical time management for shutdown and commissioning, design, supply replace old electrical, fire fighting, purging, detection system with PLC based shutdown in case of refinery fire, replacing of old electrical switchgear/panels by intelligent relays for protective, metering, logic & instrumentation circuit’s after analysis and relay coordination on new system with introducing microprocessor based IQII, MCO, HU, IQDP, and RTD module etc .  

    Kuwait Oil CompanyKOCJOPumping house supply, calibration, install test, commission of electrical/ instrumentation, in Joint Operation/TEXACO, MOV installation.KV bus CT/Relay modification, Tank Farm Project CBI USA/TEXACO for Texaco at AlZour Crude Oil Storage Area,

    EQUATE Cryogenic Tank, fire detection, electrical / instrumentation cabling, Cathodic Protection System etc.  

    EQUATE Petrochemical Kuwait, Polyethylene project, Contract Manager, Electrical Instrumentation –EPC by Snamprogetti TQM FlourDaniel as  “Project Management Team”.  

    United Electrical Network, Kuwait.  Duration: / . After Gulf War. 

    Manager for Project execution, Maintenance, overhauling contract for HT/LT feeding system motorpump, chillers, compressors, troubleshooting activities, failure analysis, and condition monitoring, commissioning.  


    Cancel
    Not Enough Credits
    Sorry, but you don't have enough credits to download this resume.

    Purchase more credits
    Not Available
    Sorry but this resume is not available for download. Please choose another!

    Close
    Confirm Download

    Would you like to download  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again
    Confirm View Complete Resume

    Would you like to view  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again