Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for adeel S. for Quality Assurance / Control / Engineering Services in karachi, Pakistan. Search More Resumes for Quality Assurance / Control on Resumark.com #LI5UGG7YF
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for adeel S. for Quality Assurance / Control / Engineering Services in karachi, Pakistan




Occupation: Quality Assurance / Control Industry: Engineering Services
Country: Pakistan City: karachi
State: Sindh ZIP: 75050



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
PDF]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
ADEEL AHMED S.
QA/QC INSPECTOR MECHANICAL
Cell : +/
Email:
Address: House No C/ Malir Colony Karachi,
| | | |
|Carrier | |Having desire to prove my ability by using modern techniques of |
|Objective | |Quality Management that can reduce product/project cost and |
| | |produce the best quality products. |
| | | |
|Technical | |B.TECH MECHANICAL |
|Qualifications| |From |
| | |“BTech in Mechanical Honors waiting for result |
| | |NEWPORTS Institute of Communication and Economics |
| | | |
| | |“BTech in Mechanical Pass |
| | |NEWPORTS Institute of Communication and Economics |
| | | |
| | |Diploma of Associate Engineer Mechanical |
| | |Saify Eide Zahabi Institute Karachi |
| | | |
| | |Secondary School Certificate Science |
| | |Board of Secondary Education Karachi. |
| | |Project: Enar Petroleum Refining Facility II Mangupir Karachi. |
|Job History | |Client : ENAR II |
| | |Employ: ALTARIQ CONSTRUCTIONS ATL |
| | | |
| | |Position: QA/QC Inspector Mechanical |
| | |Duration: May to Till Date |
| | | |
| | |Project: Qadir Pur Gas Felied Plant Project |
| | |Client: ENAR |
| | |Employ: AAAs Engineering & Services |
| | | |
| | |Position: QA/QC Inspector Mechanical |
| | |Duration: May to May |
| | | |
| | |Project : PPR Power House Bikhi S.K.P |
| | |Client: PPR Power House Bikhi S.K.P. |
| | |Employ: AAAs Engineering & Services |
| | | |
| | |Position: QA/QC Inspector Assistant Mechanical |
| | |Duration: May to May. |
| | | |
| | |Project : Engro Urea & Amonia Expantion Project Deharki |
| | |Client: Mode |
| | |Employ: FEECOM Engineering |
| | | |
| | |Position: QA/QC Inspector Assistant Mechanical |
| | |Duration: Apr to Aug. |
| | | |
|Professional | |ALTARIQ CONSTRUCTORS ATL |
|Experience | | |
|Detail | | |
| | | |
| | | |
| | | |
| | |Project : Enar Petroleum Refining Facility II Barrel Mangupir |
| | |Karachi. |
| | |Position : QA/QC Inspector Piping , NDT |
| | |Responsibilities: |
| | | |
| | |Verification of punch list after rectification. |
| | |To Maintain Record for Steel Structure & Piping work. |
| | |To check pressure gauges are calibrated. |
| | |Inspect the bolt touring of steel structure. |
| | |Inspection of welding as per approved WPS |
| | |Inspection of erection of steel structure as per drawing. |
| | |Check the fit up inspection of steel structure. |
| | |To check the fit up & welding of piping Supports as per IFC Drawing. |
| | |To check the erection of piping as per IFC plan and routings. |
| | |Prepare the DPT, RT request as per specification. |
| | |Conduct the holiday test of underground fire water pipe line. |
| | |Witness the hydro test of pipe line as per marked loop on P&ID. |
| | |Check the pneumatic test of reinforcement pads. |
| | |Having awareness of Welding Procedure Specifications WPS, Procedure|
| | |Qualification Records PQR and Welder qualification test WQT as |
| | |per codes and Standards. |
| | |AAAs Engineering & Services |
| | | |
| | | |
| | | |
| | |Project: Enar Petroleum Refining Facility II Barrel Mangupir |
| | |Karachi.. |
| | |Position: QC Inspector Piping, Steel Structure, Tank |
| | | |
| | |Responsibilities: |
| | | |
| | |Verification of punch list after rectification. |
| | |To Maintain Record for Steel Structure & Piping work. |
| | |Inspect the bolt touring of steel structure. |
| | |Inspection of erection of steel structure as per drawing. |
| | |Check the fit up inspection of steel structure. |
| | |Witness the hydro test of pipe line as per marked loop on P&ID. |
| | |To check the fit up before welding . |
| | |To prepare request before client inspection. |
| | |Erection of piping and fitting as per approved drawing. |
| | |Visual Inspection of Welding piping joints. |
| | |Check the fabrication of piping & structure as per Drawing. |
| | |Witness of hydro testing & holiday as per procedure |
| | |AAAs Engineering & Services |
| | | |
| | | |
| | |Project : Enar Petroleum Refining Facility II Barrel |
| | |Mangupir |
| | |Position : QC Inspector Piping, |
| | | |
| | |Responsibilities: |
| | | |
| | |Weld maps preparation and Control |
| | |Holiday Testing and coating inspections |
| | |Lowering and backfilling |
| | |Test Pack preparations and submission |
| | |Sand Blasting, passivation, Painting control etc |
| | |FEECOM Engineering |
| | | |
| | |Project : Engro Urea & Amonia Expantion Project Deharki |
| | |Position : QA/QC Inspector Mechanical |
| | | |
| | |Weld maps preparation and

Cancel
Not Enough Credits
Sorry, but you don't have enough credits to download this resume.

Purchase more credits
Not Available
Sorry but this resume is not available for download. Please choose another!

Close
Confirm Download

Would you like to download  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again
Confirm View Complete Resume

Would you like to view  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again