Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for Jancarlo S. for Engineer / Manufacturing in DN, Dominican Republic. Search More Resumes for Engineer on Resumark.com #PE9RNPT8H
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for Jancarlo S. for Engineer / Manufacturing in DN, Dominican Republic




Occupation: Engineer Industry: Manufacturing
Country: Dominican Republic City: DN
State: Santo Domingo ZIP: 10605



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
PDF]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
Jancarlo S. Almonte
Aut. Duarte KM ., Urbanizaci–n Don Honorio, Residencial Ferm‹n Arturo, D.N. – .. – ..
eMail:
|Background |Manufacturing Manager February ’ Present |
| |CEA Global Dominicana, S.A. |
| |Responsible of production a manufacturing engineering departments. Set departments objectives, |
| |resources management/optimization. Projects management/costs reduction |
| |Manufacturing Engineer July ’ – February ‘ |
| |CEA Global Dominicana, S.A. |
| |Product Transfer insourcingActively handling the transferring of Cardio Vascular production |
| |line from USA customer to Dominican Republic manufacturing facilities. Layout redesign. |
| |Manpower assignment. Cost Effectiveness evaluation. |
| |Projects Coordinator June ’ – December ‘ |
| |Nestl‰ Caribbean Region |
| |Brought together a high performance team which implemented and kept running the best practices |
| |at the dairy plant. Such team players are, nowadays, responsible to constantly innovate in the |
| |processes of their respective areas. |
| |Standardization of the whole plant operations by bringing the SAP solution to all departments. |
| | |
| |Plant Industrial Engineer February ’ – May ’ |
| |Nestl‰ Caribbean Region |
| |Achieved visibility of the plant KPI’s for everyone involved in the Manufacturing Process. |
| |Cost reduction projects which brought savings for .MM dollars over COP initial budget. |
| |Master Production Scheduler September ’ – February ’ |
| |Checkpoint Caribbean, LLC |
| |Restructuration to the SKU’s portfolio and implementation of Economic Production Batches, which |
| |allowed longer production runs and efficiency improvement to %. |
| |Manufacturing Supervisor July ’ – July ’ |
| |Edwards Lifesciences, AG |
| |Achieved and maintained First Time Quality Index on .% for three production lines. |
| |Improved the line layout, meeting the weekly production plan in % quality, quantity, time and|
| |cost, and assuring the workstation personnel safety at the same time. |
| |Process Engineering Technician January ’ – July ’ |
| |Edwards Lifesciences, AG |
| |Changed the manufacturing drawings in order to make them easier to understand by showing the |
| |parts assembly sequence, so any body with basic knowledge could assemble the product. |
| |Codesigner of an assembling fixture which eliminated the finger injures in the process. As a |
| |collateral benefit, reduced the given operation time from to . seconds and. |
| |Planning Technician July ’ – October ’ |
| |Abbott Hospitals, Ltd |
| |Introduced the Monthly FrozenPlan concept, and so helped to improve the customer service level.|
| | |
| |Inventory Control Technician April ’ – July ’ |
| |Abbott Hospitals, Ltd |
| |Helped to improve the service level from to % in a period of three months. |
| |Trainer in the implementation of ’S & Team Work Development April – July, |
| |Edwards Lifesciences, AG |
| |Trained and led different teams in the adoption of ‘discipline is quality’ concept and |
| |development of a teamwork mindset. |
|Complementary | |
|Courses Taken | |
| |Project Management, HM Consulting – July |
| | |
| |Communication & Leadership, Institute for Therapy and People Development – June |
| | |
| |Implementing Best Practices Global Business Excellence, Nestl‰ Mexico – MayJune |
| | |
| |Production/Industrial Performance College, Nestl‰ Switzerland – November |
| | |
| |Planning & Projects Management, Quality School – January |
| | |
| |Principles Of Lean Manufacturing, PRIMEX – February |
| | |
| |Supervisor’s Role as Facilitator Leader, Hewitt Associates – September |
| | |
| |Root Cause Investigation For CAPA, Weaver Consulting, LLC – December |
|Others |IS: MS Word, MS Excel, MS Power Point, MS Project, Primavera, AutoCAD, Solid Works, Arena |
| |simulation, AS, Outlook, Lotus Notes, J.D. Edwards, Oracle, SAP R/ – APO, Visual |
| |Manufacturing. |
|Languages | |
| |Spanish Native Language English Second language: read, write, talk |
|Professional| |
|Education |Methodological Formation Professional, INFOTEP Current |
| |Strategic Management Specialist, FUNJEPRO – April |
| |Bachelor of Science Degree: Industrial Engineering, PUCMM – December |
| |Mechatronics Technician, ITLA – August |
|References |Available, upon request. |

Cancel
Not Enough Credits
Sorry, but you don't have enough credits to download this resume.

Purchase more credits
Not Available
Sorry but this resume is not available for download. Please choose another!

Close
Confirm Download

Would you like to download  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again
Confirm View Complete Resume

Would you like to view  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again