Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for Wendell G. for Engineer / Manufacturing in Orangeburg, South Carolina. Search More Resumes for Engineer on Resumark.com #WTDMQD8UD
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for Wendell G. for Engineer / Manufacturing in Orangeburg, South Carolina




Occupation: Engineer Industry: Manufacturing
Country: United States City: Orangeburg
State: South Carolina ZIP: 29115



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
PDF]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
| Belleville Road|H |
| |C |
|Orangeburg, SC |wendell_G.@hotmail.|
| |com |
Wendell G.
|Objective | |
| |A responsible Managerial position in an established growth company |
|Summary |with broad responsibilities for achieving the overall company |
| |objective. |
| |Demonstrated achiever with exceptional knowledge in Project |
| |Management, Quality, Manufacturing Processes, Time Management, |
| |Communications, and Organizational Skills. Adept at learning new |
| |concepts quickly, working well under pressure and communicating ideas|
| |clearly and effectively. Among other activities, I design and build |
| |manufacturing aids to promote a safe and efficient production |
| |process. I perform efficiency studies and other engineering and |
| |manufacturing support assignments. I have acquired extensive computer|
| |training, including computer AidedDesign, multiple networking |
| |environments and business software packages. I am a leader and |
| |capable Manager of WorldClass abilities. |
|Experience |Feb. –Present Allied Air Enterprises, Inc. Orangeburg, SC |
| |Senior Project Engineer |
| |Project Leader for $. million Capital project: New Residential |
| |Package unit and Assembly line. |
| |Project Leader for $K Capital project: Ra refrigerant upgrade |
| |giving facility the capability of manufacturing both R and Ra |
| |product. |
| |Manufacturing Project Leader for HDF Cost Reduction project: |
| |$,, cost saving st Qtr . |
| |Manufacturing Project Leader for Seer Paragon product |
| |introductions in Orangeburg HP and AC. |
| |Project Leader for Low Cost Cube Product introduction in |
| |Orangeburg. |
| |Responsible for ensuring capital project timelines, budgets, and |
| |objectives are met. |
| |Coordinate and communicate work efforts/assignments of outside |
| |contractors and vendors. |
| |Manufacturing Engineer for residential split system Heat pump and AC |
| |production lines. |
| |Assist with programming manufacturing test procedures and analyzing |
| |test data. ECI Test Systems, Matrix Test Systems, Line Manager. |
| |Design tooling and fixturing to improve assembly efficiency and |
| |product quality. |
| |Program Burr Oak Coil and CNC copper tubing Benders. |
| |Proficient in SAP Engineering, Materials, Routings, Production |
| |levels |
| |May –Feb. Allied Air Enterprises, Inc. Orangeburg, SC |
| |Engineering Leader |
| |Guided the daily efforts of five Manufacturing Engineers in providing|
| |floor support and ensuring plant metrics of Safety, Quality, Delivery|
| |and Cost were met. |
| |Project Leader for Seer Paragon Product introductions in |
| |Orangeburg. |
| |Program Package and Splitsystem test procedures: ECI, Matrix and |
| |Line Manager Test Systems |
| |Analyze and update test procedures and parameters to ensure units are|
| |meeting the proper run specifications. |
| |Project Leader for Low Cost Cube Product Introduction in |
| |Orangeburg. |
| |Program Burr Oak Coil Benders. |
| |Oct. –May Allied Air Enterprises, Inc. Orangeburg, SC |
| |Manufacturing Engineer |
| |Provide floor support for assembly and tubing departments. |
| |Heavily involved in the development and launch of the new Paragon |
| |product in Orangeburg. $ million Capital project. Core Team Member|
| | |
| |Conduct industrial time study evaluations and production line |
| |balances. |
| |Monitor and improve Cooling assembly process and flow to ensure |
| |company goals and metrics are met and maintained. |
| |Install ergonomic lift assist systems and controls reducing safety |
| |complaints. |
| |Developed and maintained SplitSystem standard work, work |
| |instructions, line balances and process flow charts. |
| |Monitor and introduce new product and process changes through the ECN|
| |Process. |
| |Create and/or update CNC Tubing bender programs on Burr Oak Benders. |
| |Developed Quality Guidelines and Inspection criteria for Tubing |
| |Department. |
| |Heavily involved in the startup of two Splitsystem Production lines|
| |after relocation to Orangeburg. |
| | |
| |June – Oct. Allied Air Enterprises, Inc. Orangeburg, SC |
| |Production Facilitator |
| |Supervised and managed the daily production operation of the Cooling |
| |product during the OC startup in Orangeburg. Approximately |
| |employees. |
| |Responsible for maintaining company Safety, Quality, Production and |
| |Scrap Metrics. |
| |Managed and maintained Skills Matrix, Training and Job Rotation of |
| |Assembly, Tubing and Press Operators. |
| |Supervised and managed the daily production operation of the Copper |
| |Tubing Department. |
| |Trained Tubing Department Operators to properly setup and operate |
| |BurrOak CNC Tubing benders. |
| |– Mark IV Automotive/Dayco Williston, SC |
| |Production Supervisor |
| |Supervise and manage the daily operation in any area assigned in |
| |manufacturing. |
| |Coordinate manpower to operate equipment, including the scheduling of|
| |overtime to cover absenteeism, leave of absences, vacations, etc. |
| |Responsible for disciplinary actions in areas of responsibility |
| |following company guidelines. |
| |Communicate with operators daily about quality and production. |
| |Instruct operators on health and safety, fire prevention, emergency |
| |treatment practices, and housekeeping to insure a safe working |
| |environment. |
| |Monitor production schedules to ensure customer requirements and |
| |expectations are met. |
| |Ensure resolutions for customer complaints: D’s, Steps |
| |Promote plantwide teamwork with emphasis on Lean Manufacturing and |
| |Continuous improvement. |
| |Kaizen Process Improvement Team |
| |Monitor plant performance indicators. |
| |Plant Natural Management Team |
| |Team leader – Chunkout Scrap Reduction Team |
| |QS /ISO Internal Auditor Team Certified: BVQI |
|Education |Webster University Fort Jackson, SC |
| |Master of Business Administration M.B.A. |
| |South Carolina State University Orangeburg, SC |
| |B.S. Mechanical Engineering Technology ABET Accredited |
| |

Cancel
Not Enough Credits
Sorry, but you don't have enough credits to download this resume.

Purchase more credits
Not Available
Sorry but this resume is not available for download. Please choose another!

Close
Confirm Download

Would you like to download  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again
Confirm View Complete Resume

Would you like to view  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again