Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for KASHYAP S. for Supply Chain / Logistics / Manufacturing in Denver, Colorado. Search More Resumes for Supply Chain / Logistics on Resumark.com #EGLUHJV8C
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for KASHYAP S. for Supply Chain / Logistics / Manufacturing in Denver, Colorado




Occupation: Supply Chain / Logistics Industry: Manufacturing
Country: United States City: Denver
State: Colorado ZIP: 80220



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
PDF]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
Kashyap S.
Albion St Apt
Denver, CO
Objective
To apply for fulltime positions in supply chain with emphasis on sourcing and procurement operations
Skills Summary
|Customer Service |Mechanical Design |Systems engineering |
|Lean Manufacturing |Procurement |Project Management |
|Supply Chain – IT |Quality Systems |Process Improvement |
Education
• M.S., Industrial & Systems Engineering, Virginia Tech, Blacksburg, VA May
GPA Inmajor: ./.; Overall GPA: ./.
• B.E., Mechanical Engineering, Anna University, India May
GPA: ./.
Professional Experience
Operations Intern, CooperCrouse Hinds, Roanoke, VA Jul Sep
• Studied existing plant layout designs and suggested alternative floor layout designs
• Handled customer complaints in packaging and shipping departments
• Edited and documented standard operating procedures used in manufacturing and testing
Graduate Assistant, College of Engineering, Virginia Tech, Blacksburg, VA Aug May
Oversaw and managed operations through strategic planning, requirements identification, system design,
coordination, task scheduling, and execution.
• Increased faculty’s tablet PC adoption by %, using successful marketing and advertising strategies
• Redesigned college’s website using best practice methods thereby increasing traffic and enrollment
• Developed alternative system for managing tablet loaner process reducing response time by %
• Coordinated with various offices and departments for quicker response to customer complaints
Supply Chain Engineer, Sicame India Connectors Pvt. Ltd., Chennai, India Jul Jul
Participated and completed tasks within the supply chain. Coordinated and interfaced between project team
and plant personnel in layout design, equipment purchase and installation, logistics and production issues.
Managed and oversaw complete incoming of materials from import, inspection, storage and issue.
• Worked with sourcing and quality on inspection, quality improvement issues and waste reduction
• Maintained a % ontime delivery rate through effective coordination, and negotiation with vendors
• Assisted sourcing team on inter company sourcing, procurement and shipping of injection molding
machines from France and China. Issued purchase orders and coordinated with forwarders
• Followed up with suppliers, freight forwarders, and customs on orders, ensuring ontime delivery
• Improved MRP accuracy over % through better inventory cycle counts and accountability
• Saved over $ per month on orders through testing and improving parameters for scrap reduction
• Improved lead times by standardizing and documenting the entire order entry to material receipt
• Ensured single piece continuous flow for plastic molded parts adopting lean manufacturing principles
Computer Skills
Software: MS Office Suite, Oracle g, C, HTML, SQL, Dreamweaver
Tools: SAP, XL Miner, MATLAB, Vensim, Minitab, Simio, Arena, AutoCAD, ProE, ANSYS
Platforms: Windows , Vista, XP, Mac
Projects
Setting up an injection molding machine system
• Collaborated with sourcing team on price quotes for machine and machine spare part tools
• Worked with our parent company and engineering team on die tool redesign and import logistics
• Assisted in the initial set up and integration of the system by testing and timing initial trials
• Conducted time study on injection cycle time and die setup time and assisted in setting a lean
system
Design and testing of stresses on shell side nozzle in a shelltube heat exchanger for high pressure
• Reviewed existing drawings and inspected failed parts used in heavy pressure boiler applications
• Interacted with manufacturing, suppliers and customers on gathering design specifications
• Finite element model of nozzle was designed and evaluated for mechanical and thermal stresses
• Design was tested for varying axial loads and evaluated against corresponding American Society for
Mechanical Engineers ASME code
Testing and analysis of the strength of weld joint on T low alloy
steel in pipe
• Welding and joint strength test was performed on T low alloy steel pipe & analyzed for safety
• Conducted Mechanical and NDT tests, as per ASME code, Sec IX. Tests conducted for the first
time in India.
• Finite Element analysis method using ANSYS was used to study the thermal deformation stresses
Enterprise Performance Assessment Project using Malcolm Baldrige Criteria
• Interviewed senior business and IT executives to capture key business and IT imperatives
• Conducted organizational assessment across people, process and technology areas to assess
gaps
• Developed performance metrics to analyze and track internal project activities
• Conducted weekly meetings with project team and presented recommendations based on
assessment
Design of a survey instrument to measure Overall Equipment Effectiveness OEE
• Identification of metrics and Key Performance Areas KPA
• Designed questionnaires to collect data from employees on target metrics and were analyzed
• Findings were documented and improvements were suggested to redesign the survey better
Design of organizational performance measurement system for Industrial Engineering department
• Studied existing processes and existing metrics were compared with SIPOC diagram metrics
• Identified Key Process Areas, KPAs using balance scorecard measures and gaps were
analyzed
• Designed a metrics development matrix using a measurement system audit framework
Systems Engineering Management Plan for a Desalination Plant
• Gathered requirements as per customer demands and compared against system level requirements
• Translated functional requirements to actual plan and designed the system architecture
• Calculated system reliability and performed risk analysis

Cancel
Not Enough Credits
Sorry, but you don't have enough credits to download this resume.

Purchase more credits
Not Available
Sorry but this resume is not available for download. Please choose another!

Close
Confirm Download

Would you like to download  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again
Confirm View Complete Resume

Would you like to view  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again