Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for mawardi S. for Inspector / Other / Not Classified in batam, Indonesia. Search More Resumes for Inspector on Resumark.com #RX7KW4FMO
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for mawardi S. for Inspector / Other / Not Classified in batam, Indonesia




Occupation: Inspector Industry: Other / Not Classified
Country: Indonesia City: batam
State: Kepulauan Riau ZIP: 29433



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
PDF]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
MAWARDINUR S., ST
|Personal Data | |
| |Place/Date of birth : Medan / November th |
| |Nationality : Indonesian |
| |Status : Single |
| |Religion : Islam |
| |Passport No : ABKKQV |
| |Address : Perumahan Pancur Biru Blok G |
| |No |
| |Tanjung Piayu Batam |
| |Qualification : Quality Assurance Daily Activity |
| |Welding Inspector in Progress |
| |Assistant Supervisor Quality Control |
| |Autocad Application, dMax, Ansys,Matlab |
| | |
| | |
| | |
| | |
| | |
| |PROFILE |
| |A highly motivated and dynamic individual, creative, |
| |fully of ideas and intention toward improvements, capable|
| |to work independently and as a team either, easily to |
| |communicate among all levels of people Good team player |
| |and Multitasking capabilities. Proven initiative and |
| |ability to work with minimum supervision, Excellent |
| |organizational and motivational skills. |
|Formal Education | |
| | Bachelor Degree S , Mechanical Engineering,|
| |North Sumatera University North Sumatera, Indonesia |
| |Grade Point Average : . |
|Computer Skill | | |
| |Microsoft Office MS.Word,Excell,Power Point |S|
| |MsOutlook |o|
| |AutoCad D,D |f|
| |Ansys |t|
| |Mathlab |w|
| | |a|
| | |r|
| | |e|
| | |T|
| | |r|
| | |o|
| | |u|
| | |b|
| | |l|
| | |e|
| | |S|
| | |h|
| | |o|
| | |o|
| | |t|
| | |i|
| | |n|
| | |g|
| | | |
| | |H|
| | |a|
| | |r|
| | |d|
| | |w|
| | |a|
| | |r|
| | |e|
| | |T|
| | |r|
| | |o|
| | |u|
| | |b|
| | |l|
| | |e|
| | |S|
| | |h|
| | |o|
| | |o|
| | |t|
| | |i|
| | |n|
| | |g|
| | | |
|International | | |
|Standard & Quality |ISO :, | |
|System Knowledge |ISO | |
| |QC Seven Tools | |
| |AWS D. | |
| |ASME BVP, SECTION VIII RULES OF CONSTRUCTION OF PRESSURE| |
| |VESSEL | |
| |S Implementation | |
| |ASTM VARIOS SECTION | |
| |API – WELDED STEEL OF TANK OIL STORAGE | |
| |API WELDING PIPELINE AND RELATED FACILITIES | |
| |API L | |
| |ASME B . PROSES PIPING | |
| |ASME B . WROUGHT BUTTWELDING FITTING | |
| |PROFESIONAL ACCOUNTABILITIES: | |
| |To ensure effective construction quality control | |
| |performance by the Project main EPC contractor, and their| |
| |subcontractor, and this includes: | |
| |Review all welding procedures WPS and procedure | |
| |qualification records PQR’s for acceptance. | |
| |Review all welder qualification for compliance with | |
| |project requirement. | |
| |Review all welding material control, material | |
| |segregation, traceability and PAMI procedures, and PWHT | |
| |and NDT procedures for compliances with project | |
| |requirement. | |
| |Provide expertise on welding standart, techniques and | |
| |methods as needed. | |
| |Verify compliance with quality control procedures and | |
| |system for welding, PWHT, NDT, and material traceability | |
| |control, including compliance with safety requirements. | |
| |To Witness welder qualification test WQT, WPS and PQR | |
| |testing, production test plates testing. | |
| |Witness selected NDT activities, review radiographs, and | |
| |such. | |
| |Verify welding consumables control, welding control | |
| |records, certificates, and such. | |
| |Maintain records of all welding related document such as | |
| |WPS, PQR, welding tables, welder info repair rates, etc. | |
| |Provide assistance to the mechanical discipline in | |
| |witness inspection such as flange faces or bolt torque. | |
| |Review procedure for hydro testing, leak testing and | |
| |perform a related work activity in accordance with the | |
| |approved procedure and specification. | |
| |Review contractor quality system documentation, suc

Cancel
Not Enough Credits
Sorry, but you don't have enough credits to download this resume.

Purchase more credits
Not Available
Sorry but this resume is not available for download. Please choose another!

Close
Confirm Download

Would you like to download  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again
Confirm View Complete Resume

Would you like to view  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again