Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for abdul R. for Engineer / Printing & Publishing in Karachi, Pakistan. Search More Resumes for Engineer on Resumark.com #S44FNR4XW
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for abdul R. for Engineer / Printing & Publishing in Karachi, Pakistan




Occupation: Engineer Industry: Printing & Publishing
Country: Pakistan City: Karachi
State: Sindh ZIP: 74900



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
MS WORD]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
 
 
 
 

Abdul R.

House No. C/, Malir Colony, Karachi, Pakistan 

Tel    +

Cell    +

Email   

Objective

Cost conscious and analytical with history of success optimizing, quality and production process in paced manufacturing environment.

Area of Expertise

Industrial Electronics, Electrical distributions, interruption free power supplies, AC Servo mechanism, VFD’S, PLC’S, HMI’S and L.T & H.T switch gears, Flow control valves, D.P, Pressure & temperature transmitters.

PROFESSIONAL Experience 

Dec.   ~ TILL DATE Saima Packages Pvt Ltd
Position Deputy Manager Engineering & Maintenance
 
  • Job allocation and supervision of daily and weekly maintenance jobs.
  • Follow up the corrective maintenance as per job card requirement.
  • Prepare / monitor the annual and preventive maintenance plans of main plant / machineries and prepare maintenance reports.
  • Preparation of weekly departmental roaster.
  • Prepare the ISO documents.
  • Prepare and implement the plant technical and general item inventory module on ERP system with the corporation o MIS department.
  • Preparation of feasibility reports on different project proposals related to Electrical / Electronics / Instrumentation / Mechanical / HVACR / Power House.
  • Arrange and ensure the availability of Electrical / Electronics / Instrumentation / Power House / Mechanical / HVACR technical items to avoid any major breakdown.
  • Procurement of Electrical / Electronics / Instrumentation / HVACR / Power House / Mechanical material & parts.
  • Prepare the annual budget of the plant / machines for the Engineering Department.
  • Oct. ~ Nov. Delta Control Engineering Company
    Position Deputy Manager – Projects
     
  • Job allocation and supervision of daily and weekly project activities.
  • Formation of project teams.
  • Preparation of feasibility reports on different project proposals related to Electrical / Electronics / Instrumentation.Arrange and ensures the availability of applicable technical items for individual projects.
  • Procurement of Electrical / Electronics / Instrumentation material & parts
  • Prepare the B.O.Q & M of the individual projects.
  •  
                                                                      Selected Contributions
    Installation & commissioning of Field Instruments i.e. flow control valve, Temperature Transmitters, Level Transmitters, PLC & SCADA system, Venturi Burners & flame safe guard system ,  Pressure Transmitters on Natural Gas Processing Plant at Mari Gas Dharki Sindh 
    Aug. ~ Sep. English Biscuits Manufacturers Private Limited
    Position Electrical In charge  Assistant Manager – Electrical / Engineering
  • Job allocation and supervision of daily and weekly maintenance jobs.
  • Follow up the corrective maintenance as per job card requirement.
  • Prepare / monitor the annual and preventive maintenance plans of main plant and prepare maintenance reports.
  • Preparation of weekly departmental roaster.
  • Prepare the ISO & HACCP documents.
  • Prepare and implement the plant technical and general item inventory module on ERP system with the corporation o MIS department.
  • Preparation of feasibility reports on different project proposals related to Electrical / Electronics / Instrumentation.
  • Arrange and ensure the availability of Electrical / Electronics / Instrumentation technical items to avoid any major breakdown.
  • Procurement of Electrical / Electronics / Instrumentation material & parts.
  • Prepare the annual budget of the plant / machines for the Electrical / Engineering Department.
  • Selected Contributions
  • System implementation on Enterprise Resource Planning ERP.
  • Installation of PABX system with field distributions, having mobile SIM routing system.
  • Installation of Uninterrupted Power Supply of KVA on the Hybrid oven and KVA for central power supply of computers & servers.
  • Installation and commissioning of Nos . meter wide, plain & wire mesh band, meter long, with rotary moulder and wire cut units; Imaforni Italy biscuit plant with mixers and packaging machines, etc.
  • Installation and commissioning of numbers . meter wide, plain band, meter long, with wire cut & guillotine cutter units; Imaforni Italy biscuit plant with mixers and packaging machines, etc.
  • Installation and commissioning of numbers meter wide, plain & wire mesh band, meter long, with wire cut & guillotine cutter units; Imaforni Italy biscuit plant with mixers and packaging machines, etc.
  • Installation & commissioning of chocolate plant UK Based.
  • Captive power generation by installing and commissioning of numbers of Jenbacher JGS, eKW gas generators with complete designing of Civil, Mechanical and Electrical systems.
  • Installation & Commissioning of CAT Diesel Generator KVA having ATS/AMF Unmanned operation with the complete Civil, Mechanical and Electrical Works.
  • Installation and commissioning of numbers of Sanyo Japan TR Direct Gas Fired Absorption chillers with its accessories.
  • Synchronization of KVA Caterpillar Diesel Generator with numbers of Jenbacher JGS, KW Gas generators and KESC on a common bus bar.
  • Electrical Power House System Upgrading form KVA to KVA
  • Replacement of H.T Switch from O.C.B to V.C.B
  • Selection & arrangement of Electrical power cables, MCCB panel / power distribution panel, PFI panels and cable routing for new civil construction Aprox. lack SFT.
  • Trouble shooting for EEI faults, programming of Siemens/Omron/ Allen Bradley PLC’s downloading/uploading of machine software’s.
  • Worked on AC Servo mechanism system, VFD’s , HMI’s, transducers, etc.
  • Aug. ~ Jul. Control Technic
    Position Assistant Electrical Engineer
  • Burner programmer based for coil dryer room Rewiring, commissioning and replacing of new component Of Wanson Machine at Reckitt & Colman. 
  • Installation of machine panel, cable termination, commissioning and pneumatic control of Disprin expansion plan Rota press at Reckitt & Colman.   
  • Installation and commissioning of hot room temperature control system at Reckitt & Colman. 
  • Installation and commissioning of PC based temperature monitoring and control system at dryer at Reckitt & Colman.
  •  
    Mar ~ Jul. Easy Control
    POSITION Electrical Technician
  • Installation and commissioning of PC based temperature monitoring and control system for liquid vessel at Cyanamid Karachi.
  • Installation and commissioning of PLC based safeguard system for incinerator at Cyanamid Karachi.
  • Calibration & verifications for instruments of QC equipment, temperature Controller, pressure gauges and differential pressure gauges and temperature Indicators.
  • Retubing and rewiring of pneumatic logic control system of Glat machine at Knoll Pharmaceutical.
  • May ~ FEB. Pakistan Steel Mills
    POSITION Instrument Technician
  • Installation and commissioning of Capital of Blast Furnace with central monitoring control system.
  • SCHOLASTIC RECORD 

    Bachelor of Technology in Electrical _ .GPA B Tech Hons

    PRESTON UNIVERSITY, KARACHI.

    Bachelor of Technology in Electrical _ .GPA B Tech

    PRESTON UNIVERSITY, KARACHI.

    D.A.E in Electrical Technology – st Division

    GOVERNMENT COLLAGE OF TECHNOLOGY.

    MBA Project Management

    PRESTON UNIVERSITY

    Matriculation In TSC – st Division

    Government Boys Technical School, Karachi

    Professional development  

    Agenda:

    Conducted By:

    Programmable Logic Controllers & AC Drives

    Siemens Pakistan Limited

    Agenda:

    Conducted By:

    Pest Management System

    Warison Private Limited

    Agenda:

    Conducted By:

    Leadership Course For Supervisor

    PIQC

    Agenda:

    Conducted By:

    Programmable Logic Controller

    Aerocar Karachi

    Agenda:

    Conducted By:

    ISO & Hazard Analysis & Critical Control Point

    English Biscuits Manufacturers Private Limited

    Agenda:

    Conducted By:

    Baking Concept & HACCP

    English Biscuits Manufacturers Private Limited

    Agenda:

    Conducted By:

    FAG Seminar

    FAG

    COMPUETR EXPERTIES & skills 

    Operating System: Windows , Me, XP
    Microsoft Office: MS Word, MS Excel, MS Power Point, MS Outlook Express
    Others:

    Cancel
    Not Enough Credits
    Sorry, but you don't have enough credits to download this resume.

    Purchase more credits
    Not Available
    Sorry but this resume is not available for download. Please choose another!

    Close
    Confirm Download

    Would you like to download  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again
    Confirm View Complete Resume

    Would you like to view  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again