Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for Rajan L. for Engineer / Telecommunications Services in Selangor, Malaysia. Search More Resumes for Engineer on Resumark.com #QAJIKOD8W
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for Rajan L. for Engineer / Telecommunications Services in Selangor, Malaysia




Occupation: Engineer Industry: Telecommunications Services
Country: Malaysia City: Selangor
State: Selangor ZIP: 476100



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
MS WORD]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)

RESUME 

Name:      Rajandran  VythiL.

Address: F, Goodyear Court   

                 Jalan Persiaran  Kewajipan.  Subang Jaya, Selangor. Malaysia

EMail:     ,

Telephone No:    + home Mobile Phone: +                            

Date of birth:       th May

Age:                     years               

Marital Status:     Widower

Nationality:        Malaysian

Country of Residence: Malaysia

Gender:             Male  

Spoken Languages:  English and Bahasa Malaysia

Written Languages;    English and Bahasa Malaysia

Number of years working experience: years

Computer literacy: Microsoft Words Microsoft Excel

Education: General Certificate of Education 

References:

Country Manager Sudan

Contact no office   

Contact no. Mobile +

  Head of solution

cotact no.                          +

Regional Discipline Driver                                                  contact no. + .

  Mr.Eliude Kipserem    , Worked together in Uganda my last posting now   attached with Ericsson Kenya

Contact : ,+

   Mr. Julius Ronoh   Was the project rollout manager and reporting to him in my last assignment in Uganda

Contact: +

Was the project rollout manager and reporting to him in my last assignment in Uganda 
 
 

Personal Profile: 

In my career with Ericsson’s Telecommunications, I have gained and acquired vast knowledge and competence in the following fields mentioned below:  

GSM 

Implementation of  RBS / BTS, , ,,,,,,,, Node B, Transmission, Ericsson MiniLink C/E.

Implementation of Antenna & power regulating and Backup systems

Implementation of AXE / MTX exes

Implementation of DAmps, Etacs, CDMA, WCDMA, G/G,

Implementation of Indoor solution in shopping malls & highrise buildings, and also assisting Ericsson contractors with outdoor and Indoor installation and not to mention trouble shooting of equipment. 

As a keen enthusiast I gained my knowledge in the field of electronics in Ericsson and pursued my carrier in the telecommunication industry and have a total number of twentythree years of experience with Ericsson M Sdn Bhd.  The experiences are spread throughout peninsula Malaysia, Sabah and Sarawak. My foreign posting was in the Philippines. Africa, Central Africa Thailand and looking forward to more opportunity 

Exposure of working with various people and various cultures is a valuable asset to me. This has allowed me to function and execute my work professionally and precisely. My broad experience base, hardworking attitude and dedication to my work complemented with commitment and responsibility have helped me to achieve my goals as an experienced Senior Installation Executive.  
 
 
 
 
 
 

PROFESSIONA EXPERIENCE

                                                    April June 

Installation Supervision and Testing  
 

Working at Home Base Malaysia for the above mentioned period, scope of work as to my last assignments in charge of overall supervision and installation and termination of AC/DC power cablessystem, Battery backup system Emersonterminating to the respective in coming AC  power connector on the Rectifier  and also dc cables to  the respective dc modules on the backup system and cable connection from the batteries to the rectifier and checking all voltages as to the recommended spec before the final switch on in done to the rectifier for charging, RBS installation indoor and outdoor and testing, for a SubContractor who was a contractor for Civilwork, Erecting of towers, Electrical wiring, Installation of out–door RBS Cabins, for an Ericsson ASP. In the beginning of September I opted for a short break as to my late wife who was very critically ill and bed ridden and on the first week of October she passed   away, after attending and sorting out family matters was again back to work on January till June and now available at any moment as per your request to any destination. 
 
 

                                                               Sep Feb  

Overall Project Rollout / Installation Supervision & Testing / Integration of RBS cell site     and Coordinating  
 

Reporting to:                                  Project Rollout Manage 

Working on a contractual basis Coordinating and assisting the Project Manager on Executing / Monitoring of Site installation works including overall supervision and assisting Ericsson ASP on the Installation of Ericsson G &G  RBS/BTS series,,,,,, adhering to targets and quality installation of RBS / BTS  AC/DC Power systems Emerson Battery Back System and some trial site with Power One battery back system, termination of incoming AC from Generators or from the main AC supply to the respective rectifier AC modules, and DC termination to the respective breakers and modules and the batteries as to the required  installation spec and checking with volt meter to confirm that the right AC /DC voltages + is being delivered from the perspective modules as to the manufacture’s and Ericsson’  spec prier to the final switching ON is done on the backup system or the RBS/BTS cabinets beforeTesting / Integration of RBS/BTS Cell Site Installation, Liaising and coordinating with customers, quality checking of feeders,  grounding, connectors  terminated and to make sure there is no lose connection on the feeder connectors on the tower top and wrapped well and water proof , as well in the RBS Cabin, Wimax installation, Testing Transmission MLTM, Node B, TN, and Ericsson MiniLink C/E. Assisting and supervising of civil works from ground works to final installation of towers including all power related civil works on site. Assisting ASP’s in assembling of PreFabricated Cell Site at Ericsson warehouse prior to final delivery to the respective sites. Appointed as Senior O&M coordinator attending to Trouble Tickets with the BSC NOC personnel’s during RBS site break down hrs / days a week and also while deploying staff to the respective sites maintaining the required KPI’s met out. Updated the Project RollOut Manager on Cell site Quality Installation auditing and reporting of major and minor problems raised at sites to the project manager daily via mails and phone calls in Kampala and Eastern Uganda Africa.  

Sep Nov Cell net Telecommunications 

Designation  Project Coordinator 

Reporting to  Project Manager 

Coordinating installation works on a contractual basis executing RBS / BTS Roof tops and Green fields, Installation of Antennas for Roof tops and Greenfields for outdoor coverage, and transmission, in Chad Province in Central Africa.  

Coordinating with Cellular Service provider called as Celltel, assisting in the Implementation of the RBS roof tops and Greenfield Cellsites. Liaising with Project Manager, Implementation Managers, Survey and Cell planners and Civil work contractors.

      Coordination with Celtel   warehouse personals on deliveries of materials to the respective sites for implementation of Radio Equipment for Green fields, Roof–tops.  Coordinating weekly meeting and up dating progress reports to respective Ericsson Managers. 
 

• Assisting Ericsson ASP  on the  Installation of  RBS Equipment, Routing of Feeder, DCPower cable, AC cables from the main  AC  power  distribution box, Measuring of ACpower incoming, DCpower  output  with  millimeter,  routing of  Transmissioncables, Transmission Line of site Alignment, Battery backup system for RBS ,,NodeB, transmission, MiniLink, and not to mention assisting quality control personnel on  quality audit. 
 

Rectification of problems prior and after handover to customers 
 
 
 
 
 

April July Empire Engineering

Sdn Bhd 

Designation                  Project Coordinator 

Reporting to                 Project Manager 

Responsibilities 

In charge of  project coordination for laying of fiber optic cables in line with Gas piping project. 

Liaising with contractors, site supervisors, site engineers, survey personals get the necessary information for the daily job role out in Thailand.

Attend customer meetings.

Updating daily project reports.

Trouble shooting at sites.

 

Sep Mar   Dynamic Engineering Technologies.Sdn Bhd 
 

Designation                    Logestic Executive 

Reporting to                   Logestic Manager 

Responsibilities          As the same as the below mentioned 
 
 

Nov April Siemens Malaysia Telecommunication 

Designation  : Logistics Executive  

Reporting to   : Logistics Manager 

Responsibilities 

In charge of warehouse,  

•  Warehouse Management

• Maintain warehouse spare parts and project equipment.

• Track ordered materials

• Track temporary import materials

Nov Freelance Works for Operators Philippines

GLOBE TELECOMS 

Conducting, coordinating, Installation works on a contractual basis executing RBS / BTS, Installation of Antenna indoor, outdoor coverage, and transmission, in the Cebu, Davao, Philippines  

Coordinating with Ericsson Project, Implementation and Civilworks Managers. 

      Coordination with Globe Telecoms Personals, Building Land Lords, Ericsson warehouse person


Cancel
Not Enough Credits
Sorry, but you don't have enough credits to download this resume.

Purchase more credits
Not Available
Sorry but this resume is not available for download. Please choose another!

Close
Confirm Download

Would you like to download  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again
Confirm View Complete Resume

Would you like to view  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again