Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for BENEDICTUS QUASHIE N. for Installation / Maintenance / Repair / Telecommunications Services in SAINT MARC, Haiti. Search More Resumes for Installation / Maintenance / Repair on Resumark.com #9INZ7YXIO
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for BENEDICTUS QUASHIE N. for Installation / Maintenance / Repair / Telecommunications Services in SAINT MARC, Haiti




Occupation: Installation / Maintenance / Repair Industry: Telecommunications Services
Country: Haiti City: SAINT MARC
State: Nord-Est ZIP: +509



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
PDF]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
CURRICULUM VITAE
BENEDICTUS QUASHIE N.
|To acquire a rewarding professional career that requires utilization of multitasking competencies, |
|professionalism, and dedication to work. |
| |
|KEY QUALIFICATION |
| years working experience in the Telecommunication Industry. |
|Experienced in installation, Integration, Commissioning and Troubleshooting of Ericsson Node B and RBS |
|Experienced in Telecom Transmission Implementation, Site Supervision, Operation and Maintenance. |
|Experienced worked in Traffic Routing/Circuitry, Integration/Migration, Power, NSU, BTS & Engineering Dept. |
|Experienced worked Local and Abroad. |
|Experienced worked in various projects such us; Roll Out, BTS, O & M, & GSM. |
|Experienced work various vendors Telecom equipments such as Ericsson, Stratex, Nera, NEC, Ceragon, Huawei, |
|ETC. |
|Attended Seminars and Trainings with Certificates. |
| |
| |
|I am intellectually alert, quick adapt, quick to grasp new ideas and concepts. |
|I am physically strong, morally disciplined, socially adept and professionally equipped to perform. |
| |
|WORKING EXPERIENCE |
| | |
|Transmission/RAN Enineer Saint Marc Region |Transmission Implementation Supervisor/Site Controller |
|CAMTELDIGICEL OPERATIONS |Brain Technology Limited Airtel/MTN/Vodafone |
|Haiti, North America |subcontractor |
|Mobile : + |P. O. Box AD , |
|May, up to present |CapeCoast, |
| |Ghana |
|Directly involved in the Operation and Maintenance | |
|of the Cell Sites in the Saint Marc Region, Roll |March to April, |
|out Implementation of Phase , and of Digicel | |
|Projects and handled the following responsibilities|Handled the following responsibilities: |
| |Check and ensure that all equipment delivered to sites is|
|Monitor the transmission link within the region of |as per site design and on time. |
|saint marc, to reduce the probability of failures |Supervise the Installation, Testing and Commissioning |
|or degradations in the functioning systems and |PDH/SDH Digital Microwave Radio, RBS MHz/MHz, |
|forecast any future occurrences. |Power and Fiber Optical equipment. |
|Do Integration/Migration Transmission, Switch |Coordinate with other group i.e. Civil, Tower, Switch,|
|RBS,HUBS |RBS, Power, and Sub contractors for smooth flowing |
|Assist in Final Acceptance Testing and |activities, approved standard installation and prompt |
|Documentation, and handover of site to operation |delivery. |
|and maintenance. |Submit weekly project update to Regional Manager and |
|Prepares the weekly reports for the higher |monthly reports to same. |
|Management |Do Integration/Migration Transmission, Switch RBS, BSC, |
|Updates the important daily activities |MSC and GMSC. |
|Monitors the daily activities of the tasks involve |Conduct Provisionary Acceptance Test PAT and Final |
|in the projects |Acceptance Test FAT plus documentation as per plan with|
|Performs upgrades and downgrades of transmission |the presence of the client. |
|links. |Ensure that all telecom materials left on site after |
|Performs preventive and corrective maintenance on |installation are transported to the warehouse. |
|RBS series and RBS cabinets. |Proactively involved in the development and |
|Performs on site troubleshooting of links, IDBs, |implementation of Strategic Plans for the Projects. |
|software, hardwares and RBS IDB, check/loading |Records/Distributes minutes of the Superior and the |
|replaced the failure hardware, check transmission. |Strategic Planning Committee meetings and coordinates for|
|Assist Back Office during upgrade process such as |the immediate actions to the assigned tasks. |
|software, hardware, cut over and all activity |Conduct Field site survey to gather data relevant in the |
|involved in the network. |designing detailed network. |
|Take inventory of available spares, faulty, and | |
|used spares place request for limited/unavailable | |
|spares. |Region wide Radio & Transmission Engineer, |
| |MTNGhana |
| |P. O. Box TF, Accra, |
| |November, to March, |
| | |
| |Responsible for new sites inspections and acceptance |
|REGIONWIDE RADIO ENGINEER and RF OPTIMIZATION |exercises. |
|REPRESENTATIVE WESTERN/CENTRAL REGION |Team player of Integration/Migration Transmission, Switch|
|Infratech Ghana Limited Zain/Airtel Ghana |RBS,BSC,MSC and GMSC |
|Operations |Provisionary Acceptance Test PAT and Final Acceptance |
|P.O Box AN, AccraNorth. |Test FAT with the presence of the client with |
|March, to February |documentation. |
| |Coordinate with other group i.e. Switch, BSS, NSS, Cell |
|Directly involved in the Operation and Maintenance |Planning, Power Contractors and Sub contractors for |
|of ZAIN/AIRTEL GHANA OPERATIONS Cell Sites and |smooth flowing activities. |
|handled the following responsibilities: |Prepares the weekly reports for my superiors. |
|Conduct Region wide troubleshooting, preventive and|Actively participated in the development of strategies in|
|corrective maintenance of Radio and Transmission |the execution of assigned projects. |
|links of over BTS sites. |Proactively involved in the implementation of Strategic |
|Performs on site troubleshooting of NODE Bs, |Plans for the Projects. |
|check/loading CV, replaced the failure hardware, |Updates the important daily activities. |
|check transmission. |Monitors the progress of works assigned to me on a |
|Assist Back Office during upgrade process such as |project. |
|software, hardware, cut over and all activity |Records/Distributes minutes of the Superior and the |
|involved in G network. |Strategic Planning Committee meetings and coordinates for|
|Troubleshoot alarm at Node B on site using command |the immediate actions to the assigned tasks. |
|Moshell and EMAS. |Keep his Superior posted on the development and other |
|Involved in installation, configuration and |concern being performed related in the project. |
|integration new Node B RBS and . |Ensures continuous availability of power for the network |
|Do checking and troubleshooting on customer |in the area. |
|complain, visit site to investigate complains. |Carry out preventive and corrective maintenance on RBS |
|Monitor the progress of implementation activities |and Transmission equipment. |
|within the region and keep my superiors updated. |Responsible for rectification of Radio & Transmission |
|Conduct Final Acceptance Testing and Documentation.|faults. |
| |Responsible for answering generated tickets on all faults|
|Prepares the daily and weekly reports for the |within my area. |
|higher Management. |Work hand in hand with BSS & NSS in solving faults on |
|Coordinate and monitor the power team to ensure |equipment, such as Media Gateways, DDFs, GMSCs, MSCs, |
|continuous availability of power for the network in|BSCs, DXXs, etc. |
|the area. |Ensure transmission availability across all weather |
|Work hand in hand with BSS, NSS, NMC, RF, RNC, etc |conditions. |
|in solving faults on at cell sites. |Ensure the links are available all the time without any |
|Ensure that Transmission links are available across|deg. |
|all weather conditions at all times. |Maintain transmission elements with high uptime and |
|Maintain transmission elements with high uptime and|corrective maintenance. |
|corrective maintenance. |Perform antenna verification tests DTF and SWR during |
|Perform maintenance of different BTS/RBS of , |site acceptance and fault resolution processes using the |

Cancel
Not Enough Credits
Sorry, but you don't have enough credits to download this resume.

Purchase more credits
Not Available
Sorry but this resume is not available for download. Please choose another!

Close
Confirm Download

Would you like to download  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again
Confirm View Complete Resume

Would you like to view  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again