Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for Stamatis S. for Engineer / Transportation & Warehousing in Sydney, Australia. Search More Resumes for Engineer on Resumark.com #ZLFWKC9RB
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for Stamatis S. for Engineer / Transportation & Warehousing in Sydney, Australia




Occupation: Engineer Industry: Transportation & Warehousing
Country: Australia City: Sydney
State: New South Wales ZIP: 2165



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
PDF]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)
Curriculum Vitae
|STAMATIS MARTY S. BEHons | Margaret St Fairfield |
| |West, Australia, |
| |+ |
| | |
Objective
My objective as an electrical engineer with years of engineering experience in both projects
and design is to obtain a role as a senior electrical engineer as an expatriate.
Key Achievements
o Installation and Commissioning of Tunnel Services and Power Systems at RVL including
installation of kms of cabling with a $ million budget
o Prince Alfred MW substation Report on Building Code Compliance
o Ashfield kV Substation Design % Complete now commissioned
o Concept Design and Transmission Line Cutover Staging YASS kV Substation now
commissioned
Skills Summary
Project Management
• Planning, management and execution of projects
• Successful management of critical resources
• Effective communications skills to ensure information disseminated appropriately
• Forecasting
• Testing and Commissioning
• Stakeholder meetings with actions and agreements
Technical
• Advanced electrical design
• Accurate technical advice relating to system projects
• Power System Analysis & Fault Level Studies
• Schematics & Route layouts
Operational Planning
• Development of detailed scopes of work associated with major capital projects.
• Determines the materials plant and equipment requirements
• Conduct on site survey and inspections
• Technical review of submitted tenders
Contract Management
• Development of key performance indicators for contract measurement
• Modern style negotiations with contractors
• Interface with financial management system
Education
Bachelor of Engineering, Electrical, Major in Power.
University of Western Australia
Work History
Project Design Engineer RailCorp Rail Industry September – Present
RailCorp operates the rail network in metropolitan areas of Sydney. RailCorp has a fleet of ,
Electric and Diesel cars which run on , km of permanent way, across bridges, through
km of tunnels with stops at stations.
Location: Sydney NSW
List of Current Projects
• Prince Alfred Substation PA SS
• Wolli Creek Feeders
• Meeks Road Substation
• Blacktown Substation Sector B Program
• Rooty Hill Substation Sector B Program
• Seven Hills Substation Sector B Program
• Flemington
Responsibilities
• This role involves scheduling using Primavera. Important aspects involved allocation of
roles within Primavera in order to assign tasks into specific timeslots for Design review.
• Forecasting undertaken using excel.
• Engaging consultant to produce drawings which are reviewed by design reviewer
• Forward drawings to relevant stakeholders for review
• Attend site visits and meetings with Project Manager, consultant and contractor
• Arrange for consultant drawings to be updated based on stakeholder feedback
• Arrange for relevant RailCorp drawings to be updated by internal design
• Design for AC Switch House, Feeder and Transformer Alley
• Stringent requirements of Australian standards relating to substation designs, and their
construction were not met at PA SS due to updated standard. Also PA SS was built in
. I was responsible for development of a report highlighting existing fire and building
hazards and noncompliances.
• Utilisation of financial management system ARIBA for project approval and
procurement
• Discussions and investigations were initiated into potential flooding problems at Wolli
Creek. Conclusions were made which were input to the design.
• A brief was prepared for Meeks Road Substation.
• Obtained comments from stakeholders across the various RailCorp disciplineselectrical,
civil, earthing, etc
• Obtained feedback on various stages of documentation.
• Facilitate design of Sector B substations by NovoRail Alliance.
• After allocation of work orders produced monthly forecasts based on Labour costings
from Ellipse.
Achievements
• Draft report for PA Substation. There were many factors at the PA SS which made it
difficult to clearly define the compliance issues. For example the Substation was built in
the s and standards today are more stringent. So in almost every situation there were
noncompliances. The report gave a Building Code assessment of the substation building
and the scope required for rectification. The outcome of the report was that fire hazards
and noncompliant buildings forced relocation of the proposed upgrade at PA SS to two
new Greenfield sites.
• Tenders for PA SS Survey received
• Wolli Creek Tender Awarded, Geotechnical site works complete, survey complete
• Identified scope for Meeks Road
• Documentation reviewed by stakeholders for programs and projects
• Preliminary Design Review % of Rooty Hill Substation is completed.
• System Definition Review % completed for Sector B
• Obtain customer feedback from clients
• RailCorp feedback provided for Rooty Hill Design
• Wolli Creek Overhead wiring drawings complete
• Detailed Design for Rooty Hill submitted
Electrical Engineer United Group Ltd Rail Industry January – June
Engineer for United Group Infrastructure UGL has annual revenue of $Billion and activities
cover outsourced engineering asset management and property services.
Location: New South Wales and Queensland
TrackStar Alliance – Robina to Varsity Lakes Rail RVL Extension
Oct – June
This project had many aspects and the broad areas I was allocated responsibility for were:
• Installation and Commissioning Lighting and power circuits
• Coordination with Civil and Structural engineers
• Procurement of materials such as cabling and switchboards
• Preparation of overall and week look ahead programs
• Preparation of work briefs, scopes of work, and internal safety audits
Power Systems RVL
Key Responsibilities included installation of cabling to the Motorised Isolators on the RVL
project. The cabling included power supply and control wiring of about km. Achievements
included commissioning of the system and all cable installed
Tunnel Services RVL
The tunnel services involved all electrical, communication and firemain services.
About km of cable were installed.
Key Responsibilities:
• Install tunnel security lighting, phones, and socket outlets
• Arrange PLC programming for control of the Lighting. Test PLC
• Install UPS for the lighting emergency backup
• Install firemain system and pump
Achievements:
• Lighting & CCTV in Tunnel Operational
• Firemain operational
Corinda to Darra
Key Responsibilities included procurement and installation of equipment such as pits and
conduits. Achievements included commissioning of platform lighting.
Ashfield Substation
Key Responsibilities included:

Cancel
Not Enough Credits
Sorry, but you don't have enough credits to download this resume.

Purchase more credits
Not Available
Sorry but this resume is not available for download. Please choose another!

Close
Confirm Download

Would you like to download  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again
Confirm View Complete Resume

Would you like to view  for 1 credit?

You have  credits left.

Yes No 

Don't ask me again