Array
(
    [var] => cut_url
)
<pre>Array ( [var] => cut_url ) </pre> Resume for David H. in Los Alamos, New Mexico. Search More Resumes on Resumark.com #V8Z6AFCK9
 

Search Resumes

Post Jobs
 


Job Seekers:
Post Your Resume


 

Resume for David H. in Los Alamos, New Mexico




Occupation: Industry:
Country: United States City: Los Alamos
State: New Mexico ZIP: 87544



View Complete Resume   Download Resume [
Array
(
    [name] => cut_url
)
MS WORD]
Share Share


< Back to search results Preview: For the complete resume and contact info please download it.

Array
(
    [var] => content
    [type] => preview
)
Array
(
    [var] => cut_url
)

DAVID E. H., PE

Grandview Road, Hanover, PA                                        

PRINCIPAL ENGINEER / ENGINEERING MANAGER

Project Engineering & Management / Technology Development / R&D / Program Management /

Analysis / Planning / Design & Process Development / Systems Integration & Engineering

When rapidly evolving technology and customer demands required new thinking, innovative responses and significantly better outcomes, consistently served as the goto resource for the tough jobs and premier assignments. Led successful teams in devising creative solutions to manufacturing, R&D and production challenges in critical performance, zerotoleranceforerror environments.

  • Driving process development to consistent technical success
  • Finding and removing the limiting factors hindering growth
  • Building collaborative problem solving relationships
  • Registered Professional Engineer in four states, with certification from The National Council of Examiners for Engineering and Surveying NCEES, making additional PE licensing anywhere a quick process.

    Selected Accomplishments

    Strengthened QA validation and verification. Pressure to complete System Design Description SDD documents managed separately by seven Engineered Resources engineers resulted in uncoordinated, duplicated work. Developed spreadsheet to verify and validate all SDDs as a unified process instead of separate requirements in overarching Facility Design Description FDD.

    Resolved intricate production problem. Task of loading and unloading Merrick client’s tunnel furnace was complicated by radioactive dust fouling conveyor bearings. Introduced innovative solution of using chains with low friction plates linked to an automated mechanism to move trays in and out of the furnace. Saved $K.

    Introduced low cost solution to inefficiency problem. Only lbs. of hazardous material was hand loaded into drums designed to hold lbs. Modified lowcost, commercially available compactor for use in a sealed environment at Lawrence Livermore National Laboratory. Reduced need from to drums per year.

    Improved cost efficiency by combining intersecting projects. Integrated $.M replacement of aging DuPont lab waste drain system with concurrent $M lab upgrade, eliminating mutual interferences. Combined separate work orders for different labs into a single project. Brought both projects in safely, on time and within budget.

    Automated inefficient, laborintensive manufacturing process. Conceived, designed, engineered, procured, installed and started up $M fully automated material handling system to move hundreds of containers weighing lbs. each in a / DuPont production environment. Completed project safely, on time and within budget.

    Career Summary

    Manager / Senior Principal Engineer, Engineered Resources LLC, to Present. Charged with opening and managing new Los Alamos office. Plan and direct regional business development and perform organizational assessments for clients of this management consulting and engineering / environmental services company. Led team of system engineers in preparing documentation, technical writing and editing for multibillion dollar Pit Disassembly and Conversion Project for the DOE’s Savannah River Site. Prepared system engineering documents.

    Principal Design Engineer / Task Manager. Merrick & Company, to . Managed engineering group for DOE’s new, multibillion dollar Oak Ridge Uranium Processing Facility. Headed team of five senior engineers and designers providing conceptual design for unique mechanical processing equipment and “glovebox” enclosures used to isolate hazardous materials. Controlled $.M annual budget.

    Acting Safeguards Manager, URENCO USA, . Established Material Control & Accountability MC&A policies / procedures, and assured compliance with rigorous NRC regulations for enrichment of uranium used as civil power generation fuel. Led staff of two.

    Nuclear Waste Manager, Lawrence Livermore National Laboratory, to . Directed collection, certification, packaging, and disposal of hazardous waste. Led team of ten. Controlled $.M budget.

    Principal Technical Advisor, Lawrence Livermore National Laboratory, to . Performed stateoftheart research and development R&D at this world renowned national laboratory.

    Prior: Fellow Engineer, Project Manager and Project Engineer with the Westinghouse Savannah River Company. Project Manager, Project Engineer for Mechanized Systems, Plant Mechanization Coordinator, and Senior Industrial Engineer, all with E I du Pont de Nemours and Company Engineering and Textile Fibers Departments.

    Bachelor of Industrial Engineering degree from Georgia Institute of Technology.


    Cancel
    Not Enough Credits
    Sorry, but you don't have enough credits to download this resume.

    Purchase more credits
    Not Available
    Sorry but this resume is not available for download. Please choose another!

    Close
    Confirm Download

    Would you like to download  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again
    Confirm View Complete Resume

    Would you like to view  for 1 credit?

    You have  credits left.

    Yes No 

    Don't ask me again